Catalogue / Grid connectivity & GNA applications
Connectivity application to STU, Ultra seriesSample
by Kutch Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kutch Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Kutch Ultra connectivity application to STU, offered in 4 capacity applied options from 100 MW to 1000 MW. Highlights: eligibility check before filing, preparation of mandatory technical details and support for relinquishment and transfer. Suited to storage developers, industrial captive generators and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kutch
- Model
- KUT-666 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied100 MWKUT-666-01 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied250 MWKUT-666-02 | Capacity applied: 250 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied500 MWKUT-666-03 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWKUT-666-04 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 100 MW to 1000 MW (see variants) |
|---|---|
| Application | GNAmade to order: Connectivity / Both |
| Scope | End-to-end liaison |
| Bank guarantee | Arranged through partner bank |
| Studies | Grid impact summary |
| Portal handling | STU portal |
| Team | Dedicated managermade to order: Regulatory lead and engineer |
| Timeline | Approval 3-6 months |
| Technical documents | SLD, land proof, board resolutionmade to order: Switchyard layout and GA drawings |
| Queries | Until grant |
| Fee basis | Fixed |