Catalogue / Solar plant O&M & module cleaning
Robotic and waterless module cleaning, Duo 8 seriesSample
by Kutch Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kutch Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Duo 8 service of robotic and waterless module cleaning by Kutch covers 4 plant capacity options (25 MWp to 250 MWp). Highlights: daily generation and loss analysis, thermography twice a year and soiling loss tracking. Typically used for lender-monitored assets, group captive plants and c&I rooftop owners. Delivered in line with IEC 61724-1, IEC 62446-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Takeover in 2-3 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kutch
- Model
- KUT-661 series
- Listing type
- Service
- Unit
- MWp
- Minimum order
- 1 MWp
- Lead time
- Takeover in 2-3 weeks
- Warranty
- Service credits as per contract
- Standards
- IEC 61724-1, IEC 62446-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity25 MWpKUT-661-01 | Plant capacity: 25 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity50 MWpKUT-661-02 | Plant capacity: 50 MWp | 1 MWp · Takeover in 2-3 weeks | on quote |
| Plant capacity100 MWpKUT-661-03 | Plant capacity: 100 MWp | 1 MWp · Baseline audit before takeover | on quote |
| Plant capacity250 MWpKUT-661-04 | Plant capacity: 250 MWp | 1 MWp · Baseline audit before takeover | on quote |
Specifications
| Plant capacity | 25 MWp to 250 MWp (see variants) |
|---|---|
| Scope | O&M plus asset managementmade to order: Cleaning and routine checks / Full O&M with spare management |
| Cleaning method | Semi-automatic wetmade to order: Waterless dry brush / Robotic |
| Cleaning frequency | Fortnightly |
| Availability guarantee | Plant availability 99%made to order: Grid availability 99.5% |
| Manpower | 1 engineer plus 4 technicians per 10 MWmade to order: Plant manager plus 15 staff for 100 MW |
| Spares | Consumables includedmade to order: Client supplies |
| Monitoring | 24x7 remote SCADAmade to order: Weekly PR and PLF report |
| Response time | 24 hoursmade to order: 4 hours for critical faults |
| Reporting | Monthly generation report |
| Contract term | 1 yearmade to order: 3 years / 5 years |