Catalogue / Waste-heat recovery units
Exhaust waste-heat recovery boiler, Xtra seriesSample
by Lohacore Gas Turbines (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lohacore Gas Turbines (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Xtra range of exhaust waste-heat recovery boiler by Lohacore covers 4 recovered heat options (3 MWth to 20 MWth). Design: compact modular layout, diverter damper for independent engine operation and increase total plant efficiency to 80 percent plus. Typically used for cement and steel waste heat, process heat users and CHP plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lohacore
- Model
- LOH-FE1 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Drum / reel with end caps
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat3 MWthLOH-FE1-01 | Recovered heat: 3 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat5 MWthLOH-FE1-02 | Recovered heat: 5 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat10 MWthLOH-FE1-03 | Recovered heat: 10 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat20 MWthLOH-FE1-04 | Recovered heat: 20 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 3 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Gas engine exhaust |
| Gas inlet temperature | 650 C |
| Medium | Organic fluidmade to order: Steam / Hot water / Thermal oil |
| Steam pressure | 8 barmade to order: 17 bar / 40 bar |
| Power output (ORC) | 2 MW |
| Construction | Bare tubemade to order: Fin tube / Shell and tube |
| Material | SS 304 |
| Bypass damper | Diverter included |
| Design code | ASME |
| Gas pressure drop | < 250 mmWC |