Catalogue / Waste-heat recovery units
Organic Rankine cycle unit, Ultra seriesSample
by Lohacore Gas Turbines (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lohacore Gas Turbines (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Organic Rankine cycle unit from Lohacore, Ultra series: 6 recovered heat options between 0.5 MWth and 20 MWth. Key features: corrosion protection for low-temperature end, low pressure drop on engine exhaust and diverter damper for independent engine operation. Suited to CHP plants, gas engine plants and cement and steel waste heat. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lohacore
- Model
- LOH-675 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 18-26 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthLOH-675-01 | Recovered heat: 0.5 MWth | 10 nos · 18-26 weeks | on quote |
| Recovered heat1 MWthLOH-675-02 | Recovered heat: 1 MWth | 10 nos · 18-26 weeks | on quote |
| Recovered heat3 MWthLOH-675-03 | Recovered heat: 3 MWth | 10 nos · 18-26 weeks | on quote |
| Recovered heat5 MWthLOH-675-04 | Recovered heat: 5 MWth | 10 nos · 18-26 weeks | on quote |
| Recovered heat10 MWthLOH-675-05 | Recovered heat: 10 MWth | 10 nos · 18-26 weeks | on quote |
| Recovered heat20 MWthLOH-675-06 | Recovered heat: 20 MWth | 10 nos · 18-26 weeks | on quote |
Specifications
| Recovered heat | 0.5 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Gas engine exhaust |
| Gas inlet temperature | 650 C |
| Medium | Organic fluidmade to order: Steam / Hot water / Thermal oil |
| Steam pressure | 17 barmade to order: 8 bar / 40 bar |
| Power output (ORC) | 2 MW |
| Construction | Shell and tube |
| Material | Carbon steel |
| Bypass damper | Diverter included |
| Design code | IBR |
| Gas pressure drop | < 250 mmWC |