Catalogue / Waste-heat recovery units
Exhaust waste-heat recovery boiler, Smart seriesSample
by Lonavalavajra Gas Power Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Lonavalavajra Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Lonavalavajra Smart exhaust waste-heat recovery boiler, offered in 4 recovered heat options from 1 MWth to 10 MWth. Design: increase total plant efficiency to 80 percent plus, diverter damper for independent engine operation and low pressure drop on engine exhaust. Suited to process heat users, cement and steel waste heat and CHP plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Lonavalavajra
- Model
- LON-FE3 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 18-26 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat1 MWthLON-FE3-01 | Recovered heat: 1 MWth | 10 nos · 18-26 weeks | for verified buyers |
| Recovered heat3 MWthLON-FE3-02 | Recovered heat: 3 MWth | 10 nos · 18-26 weeks | for verified buyers |
| Recovered heat5 MWthLON-FE3-03 | Recovered heat: 5 MWth | 10 nos · 18-26 weeks | for verified buyers |
| Recovered heat10 MWthLON-FE3-04 | Recovered heat: 10 MWth | 10 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 1 MWth to 10 MWth (see variants) |
|---|---|
| Heat source | Gas turbine exhaustmade to order: Gas engine exhaust / Kiln gas |
| Gas inlet temperature | 650 Cmade to order: 400 C / 550 C |
| Medium | Steam |
| Steam pressure | 8 bar |
| Power output (ORC) | 2 MW |
| Construction | Bare tubemade to order: Fin tube / Shell and tube |
| Material | SS 304 |
| Bypass damper | Diverter included |
| Design code | IBRmade to order: ASME |
| Gas pressure drop | < 250 mmWC |