Catalogue / Traction SCADA

No photo yet

Remote control centre for traction, Max 2 seriesSample

by Lumengen Traction Power (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Lumengen Traction Power (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Remote control centre for traction from Lumengen, Max 2 series: 5 control posts options between Up to 10 posts and Up to 250 posts. Key features: energy and tariff reports, integration with OHE maintenance and failover in under 3 seconds. Suited to industrial rail, freight corridors and metro traction control. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Lumengen
Model
LUM-EA9 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
20-28 weeks
Warranty
36 months with AMC
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
FOR nearest railhead
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsLUM-EA9-01Control posts: Up to 10 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 25 postsLUM-EA9-02Control posts: Up to 25 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 50 postsLUM-EA9-03Control posts: Up to 50 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 100 postsLUM-EA9-04Control posts: Up to 100 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 250 postsLUM-EA9-05Control posts: Up to 250 posts1 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 250 posts (see variants)
ArchitectureDistributedmade to order: Redundant server
RTU I/OPer post
CommunicationOFC / MPLSmade to order: GSM backup
ProtocolIEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited