Merchants / LUMENGENTRACTIONPO

Lumengen Traction Power (Sample)

Lumengen Traction Power Industries Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 18 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Traction substations & transformers

V-connected traction transformer, Edge 4 series

SampleTraction substations & transformers

Lumengen · LUM-912 series

Rating
16 MVA to 50 MVA (see variants)
Primary voltage
132 kV
Secondary voltage
2 x 27.5 kV
Connection
Single-phase
Cooling
ONAN/ONAF

Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 2 nos

Price for verified buyers

invoiced by BARREL

Request quote

Traction power transformer 25 kV single-phase, Ultra series

SampleTraction substations & transformers

Lumengen · LUM-569 series

Rating
20 MVA to 30 MVA (see variants)
Primary voltage
132 kV
Secondary voltage
27.5 kV
Connection
V-V
Cooling
ONAN

Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Scott-connected traction transformer, Eco 3 series

SampleTraction substations & transformers

Lumengen · LUM-D47 series

Rating
10 MVA to 50 MVA (see variants)
Primary voltage
110 kV
Secondary voltage
2 x 27.5 kV
Connection
Auto-transformer
Cooling
ONAN/ONAF

Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 5 nos

Price on quote

invoiced by BARREL

Request quote

Section insulators & neutral sections

Section insulator with arc horns, Flex series

SampleSection insulators & neutral sections

Lumengen · LUM-FD8 series

Type
Neutral section to Auto-passing neutral (see variants)
Voltage
25 kV AC
Material
Epoxy glass
Length
15 m
Rated current
400 A

Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Insulated overlap, Titan 3 series

SampleSection insulators & neutral sections

Lumengen · LUM-354 series

Type
Standard section insulator to Auto-passing neutral (see variants)
Voltage
2 x 25 kV AC
Material
Epoxy glass
Length
18 m
Rated current
600 A

Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Neutral section with SCADA indication, Core series

SampleSection insulators & neutral sections

Lumengen · LUM-2A3 series

Type
Neutral section to Neutral section 2 x 25 kV (see variants)
Voltage
25 kV AC
Material
Polymer
Length
20 m
Rated current
600 A

Lead time 8-10 weeks · Warranty 12 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Neutral section (phase break), Pro series

SampleSection insulators & neutral sections

Lumengen · LUM-C97 series

Type
Standard section insulator to Auto-passing neutral (see variants)
Voltage
2 x 25 kV AC
Material
Epoxy glass
Length
18 m
Rated current
600 A

Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

OHE masts, cantilevers & catenary

Catenary bracket set, Eco series

SampleOHE masts, cantilevers & catenary

Lumengen · LUM-684 series

Mast type
Portal 2-track to Booster mast (see variants)
Section
Tubular
Height
8 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty As per contract · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

Steel structure for OHE, Prime 6 series

SampleOHE masts, cantilevers & catenary

Lumengen · LUM-1C3 series

Mast type
Single track mast to Booster mast (see variants)
Section
Rolled beam
Height
8 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty 12 months · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

OHE mast, Flex series

SampleOHE masts, cantilevers & catenary

Lumengen · LUM-F89 series

Mast type
Double track mast to Booster mast (see variants)
Section
Fabricated lattice
Height
9.5 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Cantilever assembly, Pro 2 series

SampleOHE masts, cantilevers & catenary

Lumengen · LUM-C24 series

Mast type
Double track mast to Tunnel bracket (see variants)
Section
Rolled beam
Height
9.5 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty 12 months · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Contact & messenger wires

Copper magnesium contact wire, Elite series

SampleContact & messenger wires

Lumengen · LUM-C88 series

Conductor
150 mm2 contact wire to Droppers (see variants)
Material
Cadmium copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 97% IACS

Lead time 8-10 weeks · Warranty As per contract · MOQ 2 km

Price for verified buyers

invoiced by BARREL

Request quote

Cadmium copper messenger wire, Elite series

SampleContact & messenger wires

Lumengen · LUM-017 series

Conductor
150 mm2 contact wire to 95 mm2 messenger (see variants)
Material
Hard drawn copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 97% IACS

Lead time 8-10 weeks · Warranty As per contract · MOQ 5 km

Price on quote

invoiced by BARREL

Request quote

Bronze catenary wire, Duo 2 series

SampleContact & messenger wires

Lumengen · LUM-003 series

Conductor
150 mm2 contact wire to 95 mm2 messenger (see variants)
Material
Hard drawn copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 80% IACS

Lead time 8-10 weeks · Warranty 12 months · MOQ 1 km

Price for verified buyers

invoiced by BARREL

Request quote

Traction SCADA

Lumengen · LUM-D77 series

Control posts
Up to 10 posts to Up to 100 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 61850

Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Lumengen · LUM-6A8 series

Control posts
Up to 25 posts to Up to 100 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 61850

Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Lumengen · LUM-EA9 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
OFC / MPLS
Protocol
IEC 60870-5-104

Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Lumengen · LUM-277 series

Control posts
Up to 25 posts to Up to 250 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
OFC / MPLS
Protocol
IEC 61850

Lead time 20-28 weeks · Warranty 24 months · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited