Catalogue / Traction SCADA

No photo yet

Traction power control software, Pro seriesSample

by Lumengen Traction Power (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Lumengen Traction Power (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Lumengen Pro traction power control software, offered in 4 control posts options from Up to 10 posts to Up to 100 posts. Design: impedance fault locator, sequence of events recording and failover in under 3 seconds. Typically used for mining railways, industrial rail and metro traction control. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Lumengen
Model
LUM-D77 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
12-16 weeks
Warranty
24 months
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Drum / reel with end caps
Delivery terms
Door delivery in metro cities
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsLUM-D77-01Control posts: Up to 10 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 25 postsLUM-D77-02Control posts: Up to 25 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 50 postsLUM-D77-03Control posts: Up to 50 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 100 postsLUM-D77-04Control posts: Up to 100 posts1 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 100 posts (see variants)
ArchitectureRedundant servermade to order: Distributed
RTU I/OPer post
CommunicationGSM backup
ProtocolIEC 61850made to order: IEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited