Catalogue / Flue-gas desulphurisation (FGD)

No photo yet

Seawater FGD, Eco 3 seriesSample

by Mahabaleshwarjoule Enviro Engineers (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Mahabaleshwarjoule Enviro Engineers (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Mahabaleshwarjoule Eco 3 seawater FGD, offered in 4 boiler size options from 120 MW to 500 MW. Design: meets SO2 limits of 2015 power plant norms, online SO2 analyser interface and gypsum bleed with dewatering. Typically used for co-generation units, captive power plants and industrial boilers. Designed and tested to MoEF&CC notification 2015, IS 11255 and CPCB norms. Lead time 24-36 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Mahabaleshwarjoule
Model
MAH-405 series
Listing type
Product
Unit
set
Minimum order
1 set
Lead time
24-36 weeks
Warranty
12 months from commissioning
Standards
MoEF&CC notification 2015, IS 11255, CPCB norms
Delivers to
South India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Boiler size120 MWMAH-405-01Boiler size: 120 MW1 set · 24-36 weeksfor verified buyers
Boiler size210 MWMAH-405-02Boiler size: 210 MW1 set · 24-36 weeksfor verified buyers
Boiler size350 MWMAH-405-03Boiler size: 350 MW1 set · 40-60 weeksfor verified buyers
Boiler size500 MWMAH-405-04Boiler size: 500 MW1 set · 40-60 weeksfor verified buyers

Specifications

Boiler size120 MW to 500 MW (see variants)
TechnologyWet limestone-gypsum
SO2 removal efficiency90%made to order: 80% / 95%
Inlet SO2Up to 2500 mg/Nm3made to order: Up to 1500 mg/Nm3
Absorber materialRubber lined carbon steel
ReagentLimestone
Gypsum qualityDisposal grademade to order: Saleable grade
Water consumptionLow
ControlDCS integrated
ChimneyWet stack liner

BARREL: Bharat Atom Renewable Resources Energy Limited