Catalogue / Waste-heat recovery units
Engine exhaust heat exchanger, Eco seriesSample
by Mahabaleshwarprakash Engine Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Mahabaleshwarprakash Engine Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Mahabaleshwarprakash Eco engine exhaust heat exchanger, offered in 6 recovered heat options from 0.5 MWth to 20 MWth. Highlights: diverter damper for independent engine operation, IBR approved design and low pressure drop on engine exhaust. Used by CHP plants, process heat users and gas engine plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Mahabaleshwarprakash
- Model
- MAH-604 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 weeks
- Warranty
- 12 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthMAH-604-01 | Recovered heat: 0.5 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat1 MWthMAH-604-02 | Recovered heat: 1 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat3 MWthMAH-604-03 | Recovered heat: 3 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat5 MWthMAH-604-04 | Recovered heat: 5 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat10 MWthMAH-604-05 | Recovered heat: 10 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat20 MWthMAH-604-06 | Recovered heat: 20 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 0.5 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Kiln gas |
| Gas inlet temperature | 550 Cmade to order: 400 C / 650 C |
| Medium | Steam |
| Steam pressure | 40 bar |
| Power output (ORC) | 500 kW |
| Construction | Fin tube |
| Material | SS 304made to order: Carbon steel / Corten |
| Bypass damper | Diverter included |
| Design code | ASMEmade to order: IBR |
| Gas pressure drop | < 250 mmWC |