Catalogue / Flue-gas desulphurisation (FGD)
Dry sorbent injection system, Duo 2 seriesSample
by Munnarspark Emission Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Munnarspark Emission Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Duo 2 range of dry sorbent injection system by Munnarspark covers 6 boiler size options (10 MW to 350 MW). Key features: meets SO2 limits of 2015 power plant norms, online SO2 analyser interface and gypsum bleed with dewatering. Suited to coal fired thermal plants, co-generation units and industrial boilers. Designed and tested to MoEF&CC notification 2015, IS 11255 and CPCB norms. Lead time 24-36 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Munnarspark
- Model
- MUN-2E1 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 1 set
- Lead time
- 24-36 weeks
- Warranty
- 24 months performance guarantee
- Standards
- MoEF&CC notification 2015, IS 11255, CPCB norms
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Boiler size10 MWMUN-2E1-01 | Boiler size: 10 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size25 MWMUN-2E1-02 | Boiler size: 25 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size60 MWMUN-2E1-03 | Boiler size: 60 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size120 MWMUN-2E1-04 | Boiler size: 120 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size210 MWMUN-2E1-05 | Boiler size: 210 MW | 1 set · 40-60 weeks | for verified buyers |
| Boiler size350 MWMUN-2E1-06 | Boiler size: 350 MW | 1 set · 40-60 weeks | for verified buyers |
Specifications
| Boiler size | 10 MW to 350 MW (see variants) |
|---|---|
| Technology | Semi-dry |
| SO2 removal efficiency | 95% |
| Inlet SO2 | Up to 2500 mg/Nm3made to order: Up to 1500 mg/Nm3 |
| Absorber material | Alloy lined |
| Reagent | Lime |
| Gypsum quality | Disposal grademade to order: Saleable grade |
| Water consumption | Standardmade to order: Low |
| Control | Standalone PLC |
| Chimney | Wet stack liner |