Catalogue / Waste-heat recovery units

No photo yet

Exhaust waste-heat recovery boiler, Ultra seriesSample

by Pataliputra Engine Power (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Pataliputra Engine Power (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Exhaust waste-heat recovery boiler from Pataliputra, Ultra series: 6 recovered heat options between 0.5 MWth and 20 MWth. Key features: low pressure drop on engine exhaust, diverter damper for independent engine operation and increase total plant efficiency to 80 percent plus. Suited to cement and steel waste heat, gas engine plants and process heat users. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Pataliputra
Model
PAT-FE7 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
18-26 weeks
Warranty
18 months
Standards
IBR 1950, ASME Sec VIII, IS 2825
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
Ex-works, freight extra at actuals
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Recovered heat0.5 MWthPAT-FE7-01Recovered heat: 0.5 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat1 MWthPAT-FE7-02Recovered heat: 1 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat3 MWthPAT-FE7-03Recovered heat: 3 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat5 MWthPAT-FE7-04Recovered heat: 5 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat10 MWthPAT-FE7-05Recovered heat: 10 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat20 MWthPAT-FE7-06Recovered heat: 20 MWth1 nos · 18-26 weeksfor verified buyers

Specifications

Recovered heat0.5 MWth to 20 MWth (see variants)
Heat sourceGas turbine exhaust
Gas inlet temperature550 Cmade to order: 400 C / 650 C
MediumThermal oilmade to order: Steam / Hot water / Organic fluid
Steam pressure8 bar
Power output (ORC)500 kW
ConstructionBare tube
MaterialCorten
Bypass damperDiverter included
Design codeIBRmade to order: ASME
Gas pressure drop< 250 mmWC

BARREL: Bharat Atom Renewable Resources Energy Limited