Catalogue / Waste-heat recovery units
Exhaust waste-heat recovery boiler, Ultra seriesSample
by Pataliputra Engine Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pataliputra Engine Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Exhaust waste-heat recovery boiler from Pataliputra, Ultra series: 6 recovered heat options between 0.5 MWth and 20 MWth. Key features: low pressure drop on engine exhaust, diverter damper for independent engine operation and increase total plant efficiency to 80 percent plus. Suited to cement and steel waste heat, gas engine plants and process heat users. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pataliputra
- Model
- PAT-FE7 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 18-26 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthPAT-FE7-01 | Recovered heat: 0.5 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat1 MWthPAT-FE7-02 | Recovered heat: 1 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat3 MWthPAT-FE7-03 | Recovered heat: 3 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat5 MWthPAT-FE7-04 | Recovered heat: 5 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat10 MWthPAT-FE7-05 | Recovered heat: 10 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat20 MWthPAT-FE7-06 | Recovered heat: 20 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 0.5 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Gas turbine exhaust |
| Gas inlet temperature | 550 Cmade to order: 400 C / 650 C |
| Medium | Thermal oilmade to order: Steam / Hot water / Organic fluid |
| Steam pressure | 8 bar |
| Power output (ORC) | 500 kW |
| Construction | Bare tube |
| Material | Corten |
| Bypass damper | Diverter included |
| Design code | IBRmade to order: ASME |
| Gas pressure drop | < 250 mmWC |