Catalogue / Waste-heat recovery units
Engine exhaust heat exchanger, Volt seriesSample
by Ravi Gas Power Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Engine exhaust heat exchanger from Ravi, Volt series: 4 recovered heat options between 0.5 MWth and 5 MWth. Design: IBR approved design, increase total plant efficiency to 80 percent plus and diverter damper for independent engine operation. Suited to cement and steel waste heat, process heat users and CHP plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-605 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Corrugated box on pallet
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthRAV-605-01 | Recovered heat: 0.5 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat1 MWthRAV-605-02 | Recovered heat: 1 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat3 MWthRAV-605-03 | Recovered heat: 3 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat5 MWthRAV-605-04 | Recovered heat: 5 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 0.5 MWth to 5 MWth (see variants) |
|---|---|
| Heat source | Kiln gasmade to order: Gas engine exhaust / Gas turbine exhaust |
| Gas inlet temperature | 650 Cmade to order: 400 C / 550 C |
| Medium | Steammade to order: Hot water / Thermal oil / Organic fluid |
| Steam pressure | 8 barmade to order: 17 bar / 40 bar |
| Power output (ORC) | 2 MW |
| Construction | Bare tubemade to order: Fin tube / Shell and tube |
| Material | Cortenmade to order: Carbon steel / SS 304 |
| Bypass damper | Diverter included |
| Design code | ASME |
| Gas pressure drop | < 250 mmWC |