Catalogue / Waste-heat recovery units
Waste-heat to power steam turbine set, Max seriesSample
by Ravi Gas Power Systems (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Ravi Max waste-heat to power steam turbine set, offered in 6 recovered heat options from 0.5 MWth to 20 MWth. Highlights: corrosion protection for low-temperature end, diverter damper for independent engine operation and increase total plant efficiency to 80 percent plus. Typically used for process heat users, gas engine plants and CHP plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-B14 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 5 nos
- Lead time
- 18-26 weeks
- Warranty
- 12 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthRAV-B14-01 | Recovered heat: 0.5 MWth | 5 nos · 18-26 weeks | on quote |
| Recovered heat1 MWthRAV-B14-02 | Recovered heat: 1 MWth | 5 nos · 18-26 weeks | on quote |
| Recovered heat3 MWthRAV-B14-03 | Recovered heat: 3 MWth | 5 nos · 18-26 weeks | on quote |
| Recovered heat5 MWthRAV-B14-04 | Recovered heat: 5 MWth | 5 nos · 18-26 weeks | on quote |
| Recovered heat10 MWthRAV-B14-05 | Recovered heat: 10 MWth | 5 nos · 18-26 weeks | on quote |
| Recovered heat20 MWthRAV-B14-06 | Recovered heat: 20 MWth | 5 nos · 18-26 weeks | on quote |
Specifications
| Recovered heat | 0.5 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Gas turbine exhaust |
| Gas inlet temperature | 650 C |
| Medium | Organic fluidmade to order: Steam / Hot water / Thermal oil |
| Steam pressure | 8 bar |
| Power output (ORC) | 2 MWmade to order: 100 kW / 500 kW |
| Construction | Bare tube |
| Material | Carbon steelmade to order: Corten / SS 304 |
| Bypass damper | Diverter included |
| Design code | ASME |
| Gas pressure drop | < 250 mmWC |