Catalogue / Waste-heat recovery units
Exhaust waste-heat recovery boiler, Ultra 7 seriesSample
by Ravi Gas Power Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Exhaust waste-heat recovery boiler from Ravi, Ultra 7 series: 5 recovered heat options between 1 MWth and 20 MWth. Design: low pressure drop on engine exhaust, corrosion protection for low-temperature end and IBR approved design. Suited to CHP plants, process heat users and gas engine plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-FE4 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 18-26 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat1 MWthRAV-FE4-01 | Recovered heat: 1 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat3 MWthRAV-FE4-02 | Recovered heat: 3 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat5 MWthRAV-FE4-03 | Recovered heat: 5 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat10 MWthRAV-FE4-04 | Recovered heat: 10 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat20 MWthRAV-FE4-05 | Recovered heat: 20 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 1 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Gas turbine exhaustmade to order: Gas engine exhaust / Kiln gas |
| Gas inlet temperature | 400 Cmade to order: 550 C / 650 C |
| Medium | Thermal oil |
| Steam pressure | 17 bar |
| Power output (ORC) | 500 kW |
| Construction | Bare tube |
| Material | SS 304 |
| Bypass damper | Diverter included |
| Design code | ASMEmade to order: IBR |
| Gas pressure drop | < 250 mmWC |