Catalogue / Traction SCADA

No photo yet

Traction SCADA system, Edge seriesSample

by Sabarmati Rail Electrification (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Sabarmati Rail Electrification (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Traction SCADA system from Sabarmati, Edge series: 5 control posts options between Up to 10 posts and Up to 250 posts. Key features: impedance fault locator, remote operation of interrupters and isolators and energy and tariff reports. Suited to freight corridors, railway zones and metro traction control. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Sabarmati
Model
SAB-6A9 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
12-16 weeks
Warranty
36 months with AMC
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsSAB-6A9-01Control posts: Up to 10 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 25 postsSAB-6A9-02Control posts: Up to 25 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 50 postsSAB-6A9-03Control posts: Up to 50 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 100 postsSAB-6A9-04Control posts: Up to 100 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 250 postsSAB-6A9-05Control posts: Up to 250 posts1 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 250 posts (see variants)
ArchitectureRedundant server
RTU I/OPer post
CommunicationGSM backupmade to order: OFC / MPLS
ProtocolIEC 61850made to order: IEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited