Merchants / SABARMATIRAILELECT

Sabarmati Rail Electrification (Sample)

Sabarmati Rail Electrification Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 16 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Contact & messenger wires

Silver copper contact wire, Xtra series

SampleContact & messenger wires

Sabarmati · SAB-0F6 series

Conductor
107 mm2 contact wire to Droppers (see variants)
Material
Copper magnesium
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 80% IACS

Lead time 4-6 weeks · Warranty 12 months · MOQ 2 km

Price for verified buyers

invoiced by BARREL

Request quote

Cadmium copper messenger wire, Eco 8 series

SampleContact & messenger wires

Sabarmati · SAB-013 series

Conductor
150 mm2 contact wire to Droppers (see variants)
Material
Hard drawn copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 97% IACS

Lead time 8-10 weeks · Warranty 12 months · MOQ 5 km

Price for verified buyers

invoiced by BARREL

Request quote

Grooved copper contact wire, Core 4 series

SampleContact & messenger wires

Sabarmati · SAB-7B1 series

Conductor
150 mm2 contact wire to 95 mm2 messenger (see variants)
Material
Hard drawn copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 97% IACS

Lead time 4-6 weeks · Warranty 12 months · MOQ 1 km

Price for verified buyers

invoiced by BARREL

Request quote

Section insulators & neutral sections

Insulated overlap, Eco 8 series

SampleSection insulators & neutral sections

Sabarmati · SAB-359 series

Type
Standard section insulator to Neutral section 2 x 25 kV (see variants)
Voltage
2 x 25 kV AC
Material
Epoxy glass
Length
20 m
Rated current
600 A

Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Section insulator with arc horns, Xtra series

SampleSection insulators & neutral sections

Sabarmati · SAB-FD8 series

Type
Standard section insulator to Auto-passing neutral (see variants)
Voltage
25 kV AC
Material
Polymer
Length
15 m
Rated current
400 A

Lead time 4-6 weeks · Warranty 12 months · MOQ 2 nos

Price on quote

invoiced by BARREL

Request quote

Neutral section (phase break), Ultra series

SampleSection insulators & neutral sections

Sabarmati · SAB-C92 series

Type
Standard section insulator to Insulated overlap (see variants)
Voltage
25 kV AC
Material
Polymer
Length
15 m
Rated current
400 A

Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

OHE masts, cantilevers & catenary

Cantilever assembly, Flex series

SampleOHE masts, cantilevers & catenary

Sabarmati · SAB-C29 series

Mast type
Single track mast to Booster mast (see variants)
Section
Rolled beam
Height
11.5 m
Steel grade
Fe 490
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty 12 months · MOQ 2 nos

Price on quote

invoiced by BARREL

Request quote

Steel structure for OHE, Plus 5 series

SampleOHE masts, cantilevers & catenary

Sabarmati · SAB-1C9 series

Mast type
Double track mast to Tunnel bracket (see variants)
Section
Tubular
Height
9.5 m
Steel grade
Fe 490
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty As per contract · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

Catenary bracket set, Plus series

SampleOHE masts, cantilevers & catenary

Sabarmati · SAB-688 series

Mast type
Double track mast to Booster mast (see variants)
Section
Fabricated lattice
Height
8 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Traction substations & transformers

V-connected traction transformer, Duo series

SampleTraction substations & transformers

Sabarmati · SAB-913 series

Rating
10 MVA to 20 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
27.5 kV
Connection
Scott
Cooling
ONAN

Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Traction power transformer 25 kV single-phase, Core 7 series

SampleTraction substations & transformers

Sabarmati · SAB-567 series

Rating
10 MVA to 50 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
27.5 kV
Connection
Single-phase
Cooling
ONAN

Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Scott-connected traction transformer, Eco 3 series

SampleTraction substations & transformers

Sabarmati · SAB-D41 series

Rating
16 MVA to 30 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
55 kV (2x25)
Connection
Scott
Cooling
ONAN

Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Traction substation with circuit breakers, Titan series

SampleTraction substations & transformers

Sabarmati · SAB-DE4 series

Rating
10 MVA to 30 MVA (see variants)
Primary voltage
110 kV
Secondary voltage
55 kV (2x25)
Connection
V-V
Cooling
ONAN

Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Traction SCADA

Sabarmati · SAB-D77 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 61850

Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Sabarmati · SAB-6A9 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 61850

Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Sabarmati · SAB-C58 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 60870-5-104

Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited