Catalogue / Traction substations & transformers
Traction substation with circuit breakers, Titan seriesSample
by Sabarmati Rail Electrification (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sabarmati Rail Electrification (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Traction substation with circuit breakers from Sabarmati, Titan series: 5 rating options between 10 MVA and 30 MVA. Key features: spares and test support, RDSO approved vendor design and low inrush performance. Suited to mining railways, port railways and indian Railways TSS. Designed and tested to RDSO Specification, IS 2026 and IEC 60076. Lead time 28-36 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sabarmati
- Model
- SAB-DE4 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 28-36 weeks
- Warranty
- 36 months from supply
- Standards
- RDSO Specification, IS 2026, IEC 60076
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Door delivery in metro cities
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Rating10 MVASAB-DE4-01 | Rating: 10 MVA | 1 nos · 28-36 weeks | for verified buyers |
| Rating16 MVASAB-DE4-02 | Rating: 16 MVA | 1 nos · 28-36 weeks | for verified buyers |
| Rating20 MVASAB-DE4-03 | Rating: 20 MVA | 1 nos · 28-36 weeks | for verified buyers |
| Rating21.6 MVASAB-DE4-04 | Rating: 21.6 MVA | 1 nos · 28-36 weeks | for verified buyers |
| Rating30 MVASAB-DE4-05 | Rating: 30 MVA | 1 nos · 28-36 weeks | for verified buyers |
Specifications
| Rating | 10 MVA to 30 MVA (see variants) |
|---|---|
| Primary voltage | 110 kVmade to order: 132 kV / 220 kV |
| Secondary voltage | 55 kV (2x25)made to order: 27.5 kV / 2 x 27.5 kV |
| Connection | V-V |
| Cooling | ONANmade to order: ONAN/ONAF |
| Tap changer | OLTC |
| Overload | 150% for 15 minmade to order: 200% for 5 min |
| Impedance | 8-10% |
| Short-circuit withstand | Per RDSO |
| Insulation | Mineral oil |
| Bushings | Oil to air |
| Protection | Buchholz, OTI, WTI, PRV |
| Noise | < 75 dB(A) |