Catalogue / OHE masts, cantilevers & catenary
Cantilever assembly, Flex seriesSample
by Sabarmati Rail Electrification (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sabarmati Rail Electrification (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Cantilever assembly from Sabarmati, Flex series: 6 mast type options between Single track mast and Booster mast. Key features: fit-up tested before dispatch, matching cantilever sets and quality inspected by RDSO nominated agencies. Suited to railway electrification, port railways and dedicated freight corridors. Designed and tested to RDSO TI/SPC/OHE, IS 800 and IS 2062. Lead time 8-12 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sabarmati
- Model
- SAB-C29 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 8-12 weeks
- Warranty
- 12 months
- Standards
- RDSO TI/SPC/OHE, IS 800, IS 2062
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Mast typeSingle track mastSAB-C29-01 | Mast type: Single track mast | 2 nos · 8-12 weeks | on quote |
| Mast typeDouble track mastSAB-C29-02 | Mast type: Double track mast | 2 nos · 8-12 weeks | on quote |
| Mast typePortal 2-trackSAB-C29-03 | Mast type: Portal 2-track | 2 nos · 8-12 weeks | on quote |
| Mast typePortal 4-trackSAB-C29-04 | Mast type: Portal 4-track | 2 nos · 8-12 weeks | on quote |
| Mast typeTunnel bracketSAB-C29-05 | Mast type: Tunnel bracket | 2 nos · 8-12 weeks | on quote |
| Mast typeBooster mastSAB-C29-06 | Mast type: Booster mast | 2 nos · 8-12 weeks | on quote |
Specifications
| Mast type | Single track mast to Booster mast (see variants) |
|---|---|
| Section | Rolled beam |
| Height | 11.5 m |
| Steel grade | Fe 490made to order: Fe 410 |
| Galvanising | Hot-dip 610 g/m2 |
| Mast bending moment | Per RDSO |
| Foundation | Pilemade to order: Concrete block |
| Cantilever | Tubular, galvanised |
| Registration arm | Included |
| Insulator | Polymer or porcelain |
| Setting distance | 2.8 m |
| Fittings | Hot-dip galvanised |
| Welding | Certified welders |