Catalogue / Traction SCADA

No photo yet

Traction power control software, Smart seriesSample

by Sabarmati Rail Electrification (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Sabarmati Rail Electrification (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Sabarmati Smart traction power control software, offered in 5 control posts options from Up to 10 posts to Up to 250 posts. Highlights: remote operation of interrupters and isolators, impedance fault locator and failover in under 3 seconds. Typically used for railway zones, mining railways and metro traction control. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Sabarmati
Model
SAB-D77 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
12-16 weeks
Warranty
36 months with AMC
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
FOR site, freight included
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsSAB-D77-01Control posts: Up to 10 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 25 postsSAB-D77-02Control posts: Up to 25 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 50 postsSAB-D77-03Control posts: Up to 50 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 100 postsSAB-D77-04Control posts: Up to 100 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 250 postsSAB-D77-05Control posts: Up to 250 posts1 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 250 posts (see variants)
ArchitectureRedundant servermade to order: Distributed
RTU I/OPer post
CommunicationGSM backupmade to order: OFC / MPLS
ProtocolIEC 61850made to order: IEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited