Catalogue / Traction SCADA

No photo yet

SCADA for 25 kV AC electrification, Pro 7 seriesSample

by Sabarmati Rail Electrification (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Request quote from Sabarmati Rail Electrification (Sample)

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Sabarmati Pro 7 SCADA for 25 kV AC electrification, offered in 5 control posts options from Up to 10 posts to Up to 250 posts. Highlights: failover in under 3 seconds, sequence of events recording and integration with OHE maintenance. Used by freight corridors, industrial rail and railway zones. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Sabarmati
Model
SAB-C58 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
20-28 weeks
Warranty
36 months with AMC
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
FOR nearest railhead
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsSAB-C58-01Control posts: Up to 10 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 25 postsSAB-C58-02Control posts: Up to 25 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 50 postsSAB-C58-03Control posts: Up to 50 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 100 postsSAB-C58-04Control posts: Up to 100 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 250 postsSAB-C58-05Control posts: Up to 250 posts1 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 250 posts (see variants)
ArchitectureRedundant server
RTU I/OPer post
CommunicationGSM backup
ProtocolIEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited