Catalogue / Waste-heat recovery units
Exhaust waste-heat recovery boiler, Core seriesSample
by Satavahana Engine Power (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satavahana Engine Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Satavahana Core exhaust waste-heat recovery boiler, offered in 5 recovered heat options from 0.5 MWth to 10 MWth. Key features: IBR approved design, compact modular layout and increase total plant efficiency to 80 percent plus. Used by cement and steel waste heat, CHP plants and process heat users. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satavahana
- Model
- SAT-FE1 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 10-14 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthSAT-FE1-01 | Recovered heat: 0.5 MWth | 2 nos · 10-14 weeks | on quote |
| Recovered heat1 MWthSAT-FE1-02 | Recovered heat: 1 MWth | 2 nos · 10-14 weeks | on quote |
| Recovered heat3 MWthSAT-FE1-03 | Recovered heat: 3 MWth | 2 nos · 10-14 weeks | on quote |
| Recovered heat5 MWthSAT-FE1-04 | Recovered heat: 5 MWth | 2 nos · 18-26 weeks | on quote |
| Recovered heat10 MWthSAT-FE1-05 | Recovered heat: 10 MWth | 2 nos · 18-26 weeks | on quote |
Specifications
| Recovered heat | 0.5 MWth to 10 MWth (see variants) |
|---|---|
| Heat source | Kiln gasmade to order: Gas engine exhaust / Gas turbine exhaust |
| Gas inlet temperature | 400 C |
| Medium | Hot water |
| Steam pressure | 8 bar |
| Power output (ORC) | 500 kWmade to order: 100 kW / 2 MW |
| Construction | Bare tubemade to order: Fin tube / Shell and tube |
| Material | SS 304 |
| Bypass damper | Diverter included |
| Design code | ASME |
| Gas pressure drop | < 250 mmWC |