Catalogue / Waste-heat recovery units
Waste-heat to power steam turbine set, Prime 9 seriesSample
by Satavahana Engine Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Satavahana Engine Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Waste-heat to power steam turbine set from Satavahana, Prime 9 series: 4 recovered heat options between 0.5 MWth and 5 MWth. Key features: low pressure drop on engine exhaust, IBR approved design and corrosion protection for low-temperature end. Suited to CHP plants, process heat users and cement and steel waste heat. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Satavahana
- Model
- SAT-B16 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 10-14 weeks
- Warranty
- 12 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthSAT-B16-01 | Recovered heat: 0.5 MWth | 10 nos · 10-14 weeks | for verified buyers |
| Recovered heat1 MWthSAT-B16-02 | Recovered heat: 1 MWth | 10 nos · 10-14 weeks | for verified buyers |
| Recovered heat3 MWthSAT-B16-03 | Recovered heat: 3 MWth | 10 nos · 18-26 weeks | for verified buyers |
| Recovered heat5 MWthSAT-B16-04 | Recovered heat: 5 MWth | 10 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 0.5 MWth to 5 MWth (see variants) |
|---|---|
| Heat source | Gas turbine exhaust |
| Gas inlet temperature | 650 C |
| Medium | Hot water |
| Steam pressure | 8 barmade to order: 17 bar / 40 bar |
| Power output (ORC) | 2 MWmade to order: 100 kW / 500 kW |
| Construction | Shell and tubemade to order: Fin tube / Bare tube |
| Material | Carbon steel |
| Bypass damper | Diverter included |
| Design code | ASMEmade to order: IBR |
| Gas pressure drop | < 250 mmWC |