Catalogue / Traction SCADA

No photo yet

Remote terminal unit for TSS, Max 9 seriesSample

by Urjaline Traction Systems (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjaline Traction Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Urjaline Max 9 remote terminal unit for TSS, offered in 3 control posts options from Up to 50 posts to Up to 250 posts. Design: failover in under 3 seconds, integration with OHE maintenance and sequence of events recording. Suited to railway zones, industrial rail and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjaline
Model
URJ-272 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
20-28 weeks
Warranty
24 months
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 50 postsURJ-272-01Control posts: Up to 50 posts1 lot · 20-28 weekson quote
Control postsUp to 100 postsURJ-272-02Control posts: Up to 100 posts1 lot · 20-28 weekson quote
Control postsUp to 250 postsURJ-272-03Control posts: Up to 250 posts1 lot · 20-28 weekson quote

Specifications

Control postsUp to 50 posts to Up to 250 posts (see variants)
ArchitectureDistributedmade to order: Redundant server
RTU I/OPer post
CommunicationOFC / MPLS
ProtocolIEC 61850made to order: IEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited