Traction SCADA

Urjaline · URJ-6A5 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 61850

Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Urjaline · URJ-EA1 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
OFC / MPLS
Protocol
IEC 60870-5-104

Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 2 lot

Price for verified buyers

invoiced by BARREL

Request quote

Urjaline · URJ-272 series

Control posts
Up to 50 posts to Up to 250 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
OFC / MPLS
Protocol
IEC 61850

Lead time 20-28 weeks · Warranty 24 months · MOQ 1 lot

Price on quote

invoiced by BARREL

Request quote

OHE masts, cantilevers & catenary

Catenary bracket set, Duo series

SampleOHE masts, cantilevers & catenary

Urjaline · URJ-687 series

Mast type
Double track mast to Booster mast (see variants)
Section
Tubular
Height
8 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty 12 months · MOQ 2 nos

Price for verified buyers

invoiced by BARREL

Request quote

Cantilever assembly, Prime series

SampleOHE masts, cantilevers & catenary

Urjaline · URJ-C24 series

Mast type
Single track mast to Tunnel bracket (see variants)
Section
Rolled beam
Height
8 m
Steel grade
Fe 490
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty 12 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Portal for overhead equipment, Edge series

SampleOHE masts, cantilevers & catenary

Urjaline · URJ-F52 series

Mast type
Portal 2-track to Booster mast (see variants)
Section
Tubular
Height
9.5 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty As per contract · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

Contact & messenger wires

Cadmium copper messenger wire, Plus series

SampleContact & messenger wires

Urjaline · URJ-012 series

Conductor
150 mm2 contact wire to 95 mm2 messenger (see variants)
Material
Cadmium copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 80% IACS

Lead time 8-10 weeks · Warranty 12 months · MOQ 5 km

Price for verified buyers

invoiced by BARREL

Request quote

Grooved copper contact wire, Eco 2 series

SampleContact & messenger wires

Urjaline · URJ-7B1 series

Conductor
107 mm2 contact wire to 95 mm2 messenger (see variants)
Material
Copper magnesium
Section
Grooved
Tensile strength
≥ 480 N/mm2
Conductivity
≥ 80% IACS

Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km

Price for verified buyers

invoiced by BARREL

Request quote

Bronze catenary wire, Core 4 series

SampleContact & messenger wires

Urjaline · URJ-005 series

Conductor
65 mm2 messenger to Droppers (see variants)
Material
Copper magnesium
Section
Grooved
Tensile strength
≥ 480 N/mm2
Conductivity
≥ 97% IACS

Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km

Price for verified buyers

invoiced by BARREL

Request quote

Section insulators & neutral sections

Section insulator with arc horns, Xtra series

SampleSection insulators & neutral sections

Urjaline · URJ-FD3 series

Type
Standard section insulator to Neutral section 2 x 25 kV (see variants)
Voltage
2 x 25 kV AC
Material
Polymer
Length
18 m
Rated current
400 A

Lead time 4-6 weeks · Warranty 24 months · MOQ 2 nos

Price for verified buyers

invoiced by BARREL

Request quote

Neutral section with SCADA indication, Duo 6 series

SampleSection insulators & neutral sections

Urjaline · URJ-2A9 series

Type
Standard section insulator to Auto-passing neutral (see variants)
Voltage
2 x 25 kV AC
Material
Epoxy glass
Length
20 m
Rated current
400 A

Lead time 8-10 weeks · Warranty 12 months · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Sectioning insulator assembly, Eco 9 series

SampleSection insulators & neutral sections

Urjaline · URJ-FF1 series

Type
Insulated overlap to Auto-passing neutral (see variants)
Voltage
25 kV AC
Material
Polymer
Length
15 m
Rated current
600 A

Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Traction substations & transformers

Traction substation with circuit breakers, Ultra series

SampleTraction substations & transformers

Urjaline · URJ-DE1 series

Rating
16 MVA to 50 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
2 x 27.5 kV
Connection
V-V
Cooling
ONAN/ONAF

Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Booster transformer, Neo 2 series

SampleTraction substations & transformers

Urjaline · URJ-065 series

Rating
10 MVA to 50 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
2 x 27.5 kV
Connection
Scott
Cooling
ONAN/ONAF

Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

V-connected traction transformer, Prime series

SampleTraction substations & transformers

Urjaline · URJ-916 series

Rating
21.6 MVA to 50 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
27.5 kV
Connection
V-V
Cooling
ONAN/ONAF

Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote