Catalogue / Traction SCADA

No photo yet

Remote control centre for traction, Neo seriesSample

by Urjaline Traction Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjaline Traction Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Neo range of remote control centre for traction by Urjaline covers 5 control posts options (Up to 10 posts to Up to 250 posts). Key features: failover in under 3 seconds, sequence of events recording and impedance fault locator. Suited to railway zones, metro traction control and industrial rail. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjaline
Model
URJ-EA1 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
20-28 weeks
Warranty
36 months with AMC
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
FOR site, freight included
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsURJ-EA1-01Control posts: Up to 10 posts2 lot · 20-28 weeksfor verified buyers
Control postsUp to 25 postsURJ-EA1-02Control posts: Up to 25 posts2 lot · 20-28 weeksfor verified buyers
Control postsUp to 50 postsURJ-EA1-03Control posts: Up to 50 posts2 lot · 20-28 weeksfor verified buyers
Control postsUp to 100 postsURJ-EA1-04Control posts: Up to 100 posts2 lot · 20-28 weeksfor verified buyers
Control postsUp to 250 postsURJ-EA1-05Control posts: Up to 250 posts2 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 250 posts (see variants)
ArchitectureDistributedmade to order: Redundant server
RTU I/OPer post
CommunicationOFC / MPLS
ProtocolIEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited