Traction SCADA system, Xtra seriesSample
by Urjaline Traction Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Request quote from Urjaline Traction Systems (Sample)Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Xtra range of traction SCADA system by Urjaline covers 5 control posts options (Up to 10 posts to Up to 250 posts). Design: integration with OHE maintenance, remote operation of interrupters and isolators and sequence of events recording. Used by railway zones, freight corridors and industrial rail. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Urjaline
- Model
- URJ-6A5 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 12-16 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 10 postsURJ-6A5-01 | Control posts: Up to 10 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 25 postsURJ-6A5-02 | Control posts: Up to 25 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 50 postsURJ-6A5-03 | Control posts: Up to 50 posts | 1 lot · 12-16 weeks | for verified buyers |
| Control postsUp to 100 postsURJ-6A5-04 | Control posts: Up to 100 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 250 postsURJ-6A5-05 | Control posts: Up to 250 posts | 1 lot · 20-28 weeks | for verified buyers |
Specifications
| Control posts | Up to 10 posts to Up to 250 posts (see variants) |
|---|---|
| Architecture | Redundant server |
| RTU I/O | Per post |
| Communication | GSM backup |
| Protocol | IEC 61850 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |