Catalogue / Traction substations & transformers

No photo yet

Traction substation with circuit breakers, Ultra seriesSample

by Urjaline Traction Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjaline Traction Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Ultra range of traction substation with circuit breakers by Urjaline covers 5 rating options (16 MVA to 50 MVA). Design: RDSO approved vendor design, condition monitoring sensors and heavy overload rating for rolling stock. Used by industrial sidings, metro and dedicated freight corridor and port railways. Designed and tested to RDSO Specification, IS 2026 and IEC 60076. Lead time 16-20 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjaline
Model
URJ-DE1 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
16-20 weeks
Warranty
36 months from supply
Standards
RDSO Specification, IS 2026, IEC 60076
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating16 MVAURJ-DE1-01Rating: 16 MVA1 nos · 16-20 weeksfor verified buyers
Rating20 MVAURJ-DE1-02Rating: 20 MVA1 nos · 16-20 weeksfor verified buyers
Rating21.6 MVAURJ-DE1-03Rating: 21.6 MVA1 nos · 16-20 weeksfor verified buyers
Rating30 MVAURJ-DE1-04Rating: 30 MVA1 nos · 28-36 weeksfor verified buyers
Rating50 MVAURJ-DE1-05Rating: 50 MVA1 nos · 28-36 weeksfor verified buyers

Specifications

Rating16 MVA to 50 MVA (see variants)
Primary voltage220 kV
Secondary voltage2 x 27.5 kV
ConnectionV-Vmade to order: Single-phase / Scott / Auto-transformer
CoolingONAN/ONAF
Tap changerOLTC
Overload150% for 15 min
Impedance8-10%
Short-circuit withstandPer RDSO
InsulationMineral oil
BushingsOil to air
ProtectionBuchholz, OTI, WTI, PRV
Noise< 75 dB(A)

BARREL: Bharat Atom Renewable Resources Energy Limited