Catalogue / Traction substations & transformers

No photo yet

Booster transformer, Neo 2 seriesSample

by Urjaline Traction Systems (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Urjaline Traction Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Booster transformer from Urjaline, Neo 2 series: 6 rating options between 10 MVA and 50 MVA. Design: withstands frequent short-circuits of traction load, condition monitoring sensors and low inrush performance. Typically used for port railways, metro and dedicated freight corridor and industrial sidings. Designed and tested to RDSO Specification, IS 2026 and IEC 60076. Lead time 28-36 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Urjaline
Model
URJ-065 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
28-36 weeks
Warranty
36 months from supply
Standards
RDSO Specification, IS 2026, IEC 60076
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating10 MVAURJ-065-01Rating: 10 MVA1 nos · 28-36 weekson quote
Rating16 MVAURJ-065-02Rating: 16 MVA1 nos · 28-36 weekson quote
Rating20 MVAURJ-065-03Rating: 20 MVA1 nos · 28-36 weekson quote
Rating21.6 MVAURJ-065-04Rating: 21.6 MVA1 nos · 28-36 weekson quote
Rating30 MVAURJ-065-05Rating: 30 MVA1 nos · 28-36 weekson quote
Rating50 MVAURJ-065-06Rating: 50 MVA1 nos · 28-36 weekson quote

Specifications

Rating10 MVA to 50 MVA (see variants)
Primary voltage220 kV
Secondary voltage2 x 27.5 kV
ConnectionScottmade to order: Single-phase / V-V / Auto-transformer
CoolingONAN/ONAFmade to order: ONAN
Tap changerOLTC
Overload200% for 5 minmade to order: 150% for 15 min
Impedance10-12%made to order: 8-10%
Short-circuit withstandPer RDSO
InsulationMineral oil
BushingsOil to air
ProtectionBuchholz, OTI, WTI, PRV
Noise< 75 dB(A)

BARREL: Bharat Atom Renewable Resources Energy Limited