Catalogue / Waste-heat recovery units
Exhaust waste-heat recovery boiler, Volt 2 seriesSample
by Vaigaispark Gas Turbines (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vaigaispark Gas Turbines (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Vaigaispark Volt 2 exhaust waste-heat recovery boiler, offered in 3 recovered heat options from 5 MWth to 20 MWth. Key features: compact modular layout, low pressure drop on engine exhaust and IBR approved design. Typically used for CHP plants, gas engine plants and process heat users. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vaigaispark
- Model
- VAI-FE1 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 weeks
- Warranty
- 12 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR site, freight included
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat5 MWthVAI-FE1-01 | Recovered heat: 5 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat10 MWthVAI-FE1-02 | Recovered heat: 10 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat20 MWthVAI-FE1-03 | Recovered heat: 20 MWth | 1 nos · 10-14 weeks | for verified buyers |
Specifications
| Recovered heat | 5 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Kiln gas |
| Gas inlet temperature | 650 Cmade to order: 400 C / 550 C |
| Medium | Organic fluidmade to order: Steam / Hot water / Thermal oil |
| Steam pressure | 40 bar |
| Power output (ORC) | 2 MWmade to order: 100 kW / 500 kW |
| Construction | Fin tubemade to order: Bare tube / Shell and tube |
| Material | SS 304made to order: Carbon steel / Corten |
| Bypass damper | Diverter included |
| Design code | ASMEmade to order: IBR |
| Gas pressure drop | < 250 mmWC |