Catalogue / Third-party inspection (TPI)
Pre-dispatch inspection of transformers and switchgear, Duo seriesSample
by Vidyutline Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Duo service of pre-dispatch inspection of transformers and switchgear by Vidyutline covers 5 inspection effort options (5 man-days to 100 man-days). Design: calibration check of test equipment, independent opinion for buyers and non-conformity reports with closure tracking. Typically used for government procurement, EPC contractors and developers and lender quality assurance. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyutline
- Model
- VID-094 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysVID-094-01 | Inspection effort: 5 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort10 man-daysVID-094-02 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort20 man-daysVID-094-03 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort50 man-daysVID-094-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort100 man-daysVID-094-05 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 5 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | PV modules and inverters |
| Inspection stage | Final pre-dispatchmade to order: Raw material / In-process |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | B.E. Electrical with 8 years experience |
| Accreditation | Empanelled inspection agency |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendors |
| Sampling | As per IS 2500made to order: AQL level II |
| Release note | Digital signature |
| Travel | Included in rate |