Merchants / VIDYUTLINETECHNICA

Vidyutline Technical Services (Sample)

Vidyutline Technical Services Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 23 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Power system studies (load flow, short circuit, grid code)

Load flow and short-circuit study, Neo 5 series

SampleServicePower system studies (load flow, short circuit, grid code)

Vidyutline · VID-468 series

Network scale
11 kV plant to 220 kV system (see variants)
Study type
Harmonics
Software
DIgSILENT PowerFactory
Model data
Client single line diagram and data
Deliverables
Model files and relay settings

Lead time Kick-off in 1 week · Warranty Revision for utility comments · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Load flow and short-circuit study, Duo series

SampleServicePower system studies (load flow, short circuit, grid code)

Vidyutline · VID-465 series

Network scale
11 kV plant to 400 kV system (see variants)
Study type
Harmonics
Software
DIgSILENT PowerFactory
Model data
Client single line diagram and data
Deliverables
Model files and relay settings

Lead time 2-6 weeks · Warranty Revision for utility comments · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Tariff & regulatory advisory

Intervention in regulatory proceedings, Max 6 series

SampleServiceTariff & regulatory advisory

Vidyutline · VID-CA7 series

Matter complexity
Advisory note to Appeal before APTEL (see variants)
Forum
CERC
Deliverable
Petition with annexures
Representation
Drafting only
Data support
Benchmark analysis

Lead time Initial note in 1 week · Warranty As per engagement letter · MOQ 1 case

Price for verified buyers

invoiced by BARREL

Request quote

Technical, legal & financial due diligence

Technical due diligence for operating renewable assets, Volt series

SampleServiceTechnical, legal & financial due diligence

Vidyutline · VID-4C7 series

Portfolio size
25 MW to 250 MW (see variants)
Scope
Legal
Site visit
All sites above 10 MW
Legal items
Litigation and compliance check
Financial items
Debt and covenant review

Lead time Kick-off in 1 week · Warranty Clarifications until deal closing · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Technical due diligence for operating renewable assets, Elite series

SampleServiceTechnical, legal & financial due diligence

Vidyutline · VID-4C7 series

Portfolio size
50 MW to 250 MW (see variants)
Scope
Integrated technical, legal and financial
Site visit
All sites above 10 MW
Legal items
Litigation and compliance check
Financial items
Revenue, receivables, tax

Lead time 3-8 weeks · Warranty Professional indemnity · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Resource assessment (solar, wind, hydro)

Energy yield assessment P50 and P90, Core series

SampleServiceResource assessment (solar, wind, hydro)

Vidyutline · VID-EB9 series

Measurement duration
Desktop study to 24 months (see variants)
Technology
Solar GHI/DNI
Data source
Hybrid with MCP
Equipment
80-120 m met mast with LiDAR
Uncertainty
Bankable assessment

Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Energy yield assessment P50 and P90, Smart series

SampleServiceResource assessment (solar, wind, hydro)

Vidyutline · VID-EB8 series

Measurement duration
3 months to 18 months (see variants)
Technology
Solar GHI/DNI
Data source
On-site measurement
Equipment
80-120 m met mast with LiDAR
Uncertainty
P50/P90 with uncertainty budget

Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Product certification (BIS, IEC, ALMM)

CE and UL certification liaison, Smart 4 series

SampleServiceProduct certification (BIS, IEC, ALMM)

Vidyutline · VID-557 series

Certification scope
ALMM List-I to Full global set (see variants)
Standards covered
IEC 62109 for inverters
Application support
End-to-end with lab liaison
Test lab liaison
Notified bodies
Factory audit
BIS inspection support

Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application

Price for verified buyers

invoiced by BARREL

Request quote

CE and UL certification liaison, Core 3 series

SampleServiceProduct certification (BIS, IEC, ALMM)

Vidyutline · VID-559 series

Certification scope
ALMM List-II (cells) to Multi-standard IEC set (see variants)
Standards covered
IEC 61215 and 61730
Application support
End-to-end with lab liaison
Test lab liaison
Notified bodies
Factory audit
Pre-audit gap analysis

Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application

Price on quote

invoiced by BARREL

Request quote

Third-party inspection (TPI)

Vidyutline · VID-095 series

Inspection effort
1 man-day to 50 man-days (see variants)
Equipment inspected
Cables and conductors
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day

Price for verified buyers

invoiced by BARREL

Request quote

Vidyutline · VID-094 series

Inspection effort
5 man-days to 100 man-days (see variants)
Equipment inspected
PV modules and inverters
Inspection stage
Final pre-dispatch
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day

Price for verified buyers

invoiced by BARREL

Request quote

Feasibility studies & DPR

Captive power and open access feasibility, Titan series

SampleServiceFeasibility studies & DPR

Vidyutline · VID-D54 series

Project capacity
1 MW to 500 MW (see variants)
Scope
Bankable DPR
Energy yield
PVsyst P50/P90
Financial model
Sensitivity and tariff analysis
Grid assessment
Nearest substation capacity check

Lead time 3-12 weeks · Warranty Clarification support for 6 months · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Captive power and open access feasibility, Core series

SampleServiceFeasibility studies & DPR

Vidyutline · VID-D51 series

Project capacity
10 MW to 1 GW (see variants)
Scope
Feasibility with financial model
Energy yield
WAsP wind energy assessment
Financial model
Sensitivity and tariff analysis
Grid assessment
GNA/connectivity route study

Lead time Kick-off in 1 week · Warranty Clarification support for 6 months · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Lender's engineer & TEV studies

Operating-phase compliance review, Titan series

SampleServiceLender's engineer & TEV studies

Vidyutline · VID-B21 series

Project cost
INR 25 crore to INR 1000 crore (see variants)
Phase
Pre-financing TEV
Scope
Technical, cost and schedule review
Reporting
TEV report
Site visits
At milestones

Lead time Appointment in 1 week · Warranty Report reliance letter to lenders · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Electrical safety audits

Statutory electrical compliance audit, Xtra 4 series

SampleServiceElectrical safety audits

Vidyutline · VID-751 series

Installed load
500 kVA to 50 MVA (see variants)
Scope
Audit with measurements
Auditor
Chartered engineer
Measurements
Thermography and power quality
Report
Action plan with timeline

Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Statutory electrical compliance audit, Elite series

SampleServiceElectrical safety audits

Vidyutline · VID-758 series

Installed load
10 MVA to 50 MVA (see variants)
Scope
Audit with arc-flash study
Auditor
CEA-licensed engineer
Measurements
Earth resistance, insulation
Report
Action plan with timeline

Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

EIA, ESG & environmental studies

Environmental and social management plan, Max series

SampleServiceEIA, ESG & environmental studies

Vidyutline · VID-8B3 series

Project scale
50 MW to 1 GW (see variants)
Study
Comprehensive EIA
Baseline season
Three seasons
Deliverables
Draft EIA, EMP, public hearing support
Lab testing
In-house lab

Lead time 8-12 weeks, longer with seasonal baseline · Warranty As per contract · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Site acceptance & pre-commissioning tests

Earth resistance and step-touch potential tests, Elite series

SampleServiceSite acceptance & pre-commissioning tests

Vidyutline · VID-C99 series

Plant size
25 MW to 100 MW (see variants)
Scope
Complete SAT with performance test
Instruments
Insulation tester, earth tester
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Earth resistance and step-touch potential tests, Edge 9 series

SampleServiceSite acceptance & pre-commissioning tests

Vidyutline · VID-C95 series

Plant size
1 MW to 25 MW (see variants)
Scope
Complete SAT with performance test
Instruments
Insulation tester, earth tester
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price on quote

invoiced by BARREL

Request quote

Type & routine testing laboratories (NABL)

Type testing of transformers and switchgear, Smart series

SampleServiceType & routine testing laboratories (NABL)

Vidyutline · VID-929 series

Test class
Acceptance test to Type test (HV) (see variants)
Equipment under test
Distribution transformers
Accreditation
NABL ISO/IEC 17025
Rating range
Up to 33 kV
Test standard
Customer specific test plan

Lead time Test report in 3-8 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Type testing of transformers and switchgear, Max series

SampleServiceType & routine testing laboratories (NABL)

Vidyutline · VID-921 series

Test class
Routine test to Type test (HV) (see variants)
Equipment under test
Power transformers
Accreditation
NABL ISO/IEC 17025
Rating range
Up to 400 kV
Test standard
Customer specific test plan

Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Factory acceptance test (FAT) witnessing

FAT for GIS and switchgear, Volt series

SampleServiceFactory acceptance test (FAT) witnessing

Vidyutline · VID-177 series

Equipment value
INR 25 lakh to INR 25 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
International factory

Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price on quote

invoiced by BARREL

Request quote

FAT for GIS and switchgear, Neo series

SampleServiceFactory acceptance test (FAT) witnessing

Vidyutline · VID-172 series

Equipment value
INR 50 lakh to INR 5 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Lead engineer and assistant
Location
International factory

Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day

Price on quote

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited