Catalogue / Power system studies (load flow, short circuit, grid code)
Load flow and short-circuit study, Neo 5 seriesSample
by Vidyutline Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Vidyutline Neo 5 load flow and short-circuit study, offered in 5 network scale options from 11 kV plant to 220 kV system. Design: fault level verification of switchgear, models acceptable to STU and CTUIL and relay setting files ready to load. Suited to BESS integrators, renewable developers seeking connectivity and industrial plants adding generation. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyutline
- Model
- VID-468 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Revision for utility comments
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantVID-468-01 | Network scale: 11 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale33 kV plantVID-468-02 | Network scale: 33 kV plant | 1 report · Kick-off in 1 week | on quote |
| Network scale66 kV systemVID-468-03 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | on quote |
| Network scale132 kV systemVID-468-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemVID-468-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 220 kV system (see variants) |
|---|---|
| Study type | Harmonics |
| Software | DIgSILENT PowerFactory |
| Model data | Client single line diagram and datamade to order: Utility network model |
| Deliverables | Model files and relay settings |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Lender review |
| Scenarios | Multiple dispatch casesmade to order: Normal and N-1 |
| Team | Lead plus modelling specialist |
| Turnaround | 4-6 weeks |
| Validation | Compared with measured data |