Catalogue / Power system studies (load flow, short circuit, grid code)
Load flow and short-circuit study, Duo seriesSample
by Vidyutline Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Vidyutline Duo load flow and short-circuit study, offered in 6 network scale options from 11 kV plant to 400 kV system. Design: relay setting files ready to load, reactive power capability curves and PSS/E and PSCAD model support. Suited to industrial plants adding generation, BESS integrators and renewable developers seeking connectivity. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyutline
- Model
- VID-465 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Revision for utility comments
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantVID-465-01 | Network scale: 11 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale33 kV plantVID-465-02 | Network scale: 33 kV plant | 1 report · 2-6 weeks | on quote |
| Network scale66 kV systemVID-465-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | on quote |
| Network scale132 kV systemVID-465-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | on quote |
| Network scale220 kV systemVID-465-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | on quote |
| Network scale400 kV systemVID-465-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | on quote |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Harmonicsmade to order: Load flow and short circuit / Dynamic and transient / Protection coordination |
| Software | DIgSILENT PowerFactorymade to order: ETAP / PSS/E |
| Model data | Client single line diagram and data |
| Deliverables | Model files and relay settingsmade to order: Study report with results |
| Grid code checks | Voltage and reactive power capabilitymade to order: LVRT/HVRT and ramp rate |
| Review | Lender reviewmade to order: Utility submission support |
| Scenarios | Multiple dispatch cases |
| Team | Lead plus modelling specialistmade to order: Power system engineer |
| Turnaround | 2-3 weeks |
| Validation | Compared with measured data |