Catalogue / Electrical safety audits
Statutory electrical compliance audit, Elite seriesSample
by Vidyutline Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Vidyutline Elite statutory electrical compliance audit, offered in 3 installed load options from 10 MVA to 50 MVA. Highlights: training recommendations for staff, earthing health and soil resistivity and fire exit and detection checks. Used by manufacturing plants, data centres and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyutline
- Model
- VID-758 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load10 MVAVID-758-01 | Installed load: 10 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load25 MVAVID-758-02 | Installed load: 25 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load50 MVAVID-758-03 | Installed load: 50 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
Specifications
| Installed load | 10 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Audit with arc-flash studymade to order: Visual and documentation audit / Audit with measurements |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Earth resistance, insulation |
| Report | Action plan with timeline |
| Statutory records | Registers, test certificates, licence |
| Sampling | 100% of HV equipment |
| Follow-up | Re-audit after 3 monthsmade to order: Close-out verification |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Report onlymade to order: Findings to management |
| Accreditation | Government recognised agency |