Catalogue / Electrical safety audits

No photo yet

Statutory electrical compliance audit, Elite seriesSample

by Vidyutline Technical Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Vidyutline Elite statutory electrical compliance audit, offered in 3 installed load options from 10 MVA to 50 MVA. Highlights: training recommendations for staff, earthing health and soil resistivity and fire exit and detection checks. Used by manufacturing plants, data centres and hospitals and commercial buildings. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Vidyutline
Model
VID-758 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load10 MVAVID-758-01Installed load: 10 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load25 MVAVID-758-02Installed load: 25 MVA1 site · Audit in 1-2 weeksfor verified buyers
Installed load50 MVAVID-758-03Installed load: 50 MVA1 site · Audit in 1-2 weeksfor verified buyers

Specifications

Installed load10 MVA to 50 MVA (see variants)
ScopeAudit with arc-flash studymade to order: Visual and documentation audit / Audit with measurements
AuditorCEA-licensed engineermade to order: Chartered engineer
MeasurementsEarth resistance, insulation
ReportAction plan with timeline
Statutory recordsRegisters, test certificates, licence
Sampling100% of HV equipment
Follow-upRe-audit after 3 monthsmade to order: Close-out verification
Turnaround3-4 weeksmade to order: 1-2 weeks
PresentationReport onlymade to order: Findings to management
AccreditationGovernment recognised agency

BARREL: Bharat Atom Renewable Resources Energy Limited