Catalogue / Resource assessment (solar, wind, hydro)
Energy yield assessment P50 and P90, Core seriesSample
by Vidyutline Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core service of energy yield assessment P50 and P90 by Vidyutline covers 6 measurement duration options (Desktop study to 24 months). Highlights: extreme wind and wake studies, long-term correction using reference data and loss factors for local conditions. Used by hybrid project planners, lenders needing P90 and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyutline
- Model
- VID-EB9 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studyVID-EB9-01 | Measurement duration: Desktop study | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration3 monthsVID-EB9-02 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration6 monthsVID-EB9-03 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration12 monthsVID-EB9-04 | Measurement duration: 12 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration18 monthsVID-EB9-05 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration24 monthsVID-EB9-06 | Measurement duration: 24 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | Desktop study to 24 months (see variants) |
|---|---|
| Technology | Solar GHI/DNI |
| Data source | Hybrid with MCPmade to order: Satellite and reanalysis / On-site measurement |
| Equipment | 80-120 m met mast with LiDAR |
| Uncertainty | Bankable assessment |
| Modelling | PVsyst, SAM |
| Deliverable | Resource report |
| Calibration | Traceable calibrationmade to order: Calibration pre and post campaign |
| Site count | Multi-site comparison |
| Maintenance | Quarterly site visitmade to order: Remote health checks |
| Turnaround | Report within 6 weeks of data |