Catalogue / Third-party inspection (TPI)
Pre-dispatch inspection of transformers and switchgear, Xtra 3 seriesSample
by Vidyutline Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Vidyutline Xtra 3 pre-dispatch inspection of transformers and switchgear, offered in 5 inspection effort options from 1 man-day to 50 man-days. Highlights: quick mobilisation across India, photographic evidence of each inspection and calibration check of test equipment. Suited to government procurement, EPC contractors and developers and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyutline
- Model
- VID-095 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayVID-095-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort5 man-daysVID-095-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort10 man-daysVID-095-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | for verified buyers |
| Inspection effort20 man-daysVID-095-04 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort50 man-daysVID-095-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 1 man-day to 50 man-days (see variants) |
|---|---|
| Equipment inspected | Cables and conductorsmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | In-processmade to order: Raw material / Final pre-dispatch |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | B.E. Electrical with 8 years experiencemade to order: Level II NDT certified |
| Accreditation | Empanelled inspection agency |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Pan Indiamade to order: Domestic and export vendors |
| Sampling | AQL level IImade to order: As per IS 2500 |
| Release note | Digital signature |
| Travel | Included in ratemade to order: At actuals |