Catalogue / Third-party inspection (TPI)

No photo yet

Pre-dispatch inspection of transformers and switchgear, Xtra 3 seriesSample

by Vidyutline Technical Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Vidyutline Xtra 3 pre-dispatch inspection of transformers and switchgear, offered in 5 inspection effort options from 1 man-day to 50 man-days. Highlights: quick mobilisation across India, photographic evidence of each inspection and calibration check of test equipment. Suited to government procurement, EPC contractors and developers and utilities and PSUs. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Vidyutline
Model
VID-095 series
Listing type
Service
Unit
day
Minimum order
1 day
Lead time
Inspector assigned in 48 hours
Warranty
As per contract
Standards
ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Inspection effort1 man-dayVID-095-01Inspection effort: 1 man-day1 day · Inspector assigned in 48 hoursfor verified buyers
Inspection effort5 man-daysVID-095-02Inspection effort: 5 man-days1 day · Inspector assigned in 48 hoursfor verified buyers
Inspection effort10 man-daysVID-095-03Inspection effort: 10 man-days1 day · Inspector assigned in 48 hoursfor verified buyers
Inspection effort20 man-daysVID-095-04Inspection effort: 20 man-days1 day · Report in 24-48 hoursfor verified buyers
Inspection effort50 man-daysVID-095-05Inspection effort: 50 man-days1 day · Report in 24-48 hoursfor verified buyers

Specifications

Inspection effort1 man-day to 50 man-days (see variants)
Equipment inspectedCables and conductorsmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters
Inspection stageIn-processmade to order: Raw material / Final pre-dispatch
Standards usedPer approved QAPmade to order: Per client specification
Inspector qualificationB.E. Electrical with 8 years experiencemade to order: Level II NDT certified
AccreditationEmpanelled inspection agency
ReportInspection release notemade to order: Detailed report with photos in 48 hours
CoveragePan Indiamade to order: Domestic and export vendors
SamplingAQL level IImade to order: As per IS 2500
Release noteDigital signature
TravelIncluded in ratemade to order: At actuals

BARREL: Bharat Atom Renewable Resources Energy Limited