Catalogue / Resource assessment (solar, wind, hydro)
Energy yield assessment P50 and P90, Smart seriesSample
by Vidyutline Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Vidyutline Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Energy yield assessment P50 and P90 from Vidyutline, Smart series: 4 measurement duration options between 3 months and 18 months. Design: turbine and module selection input, loss factors for local conditions and long-term correction using reference data. Suited to wind and solar developers, state agencies mapping resource and hybrid project planners. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Vidyutline
- Model
- VID-EB8 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration3 monthsVID-EB8-01 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration6 monthsVID-EB8-02 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration12 monthsVID-EB8-03 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration18 monthsVID-EB8-04 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | for verified buyers |
Specifications
| Measurement duration | 3 months to 18 months (see variants) |
|---|---|
| Technology | Solar GHI/DNImade to order: Wind / Small hydro |
| Data source | On-site measurement |
| Equipment | 80-120 m met mast with LiDARmade to order: Class A pyranometer station |
| Uncertainty | P50/P90 with uncertainty budget |
| Modelling | PVsyst, SAM |
| Deliverable | Resource reportmade to order: Hourly time series dataset |
| Calibration | Traceable calibrationmade to order: Calibration pre and post campaign |
| Site count | Single sitemade to order: Multi-site comparison |
| Maintenance | Remote health checks |
| Turnaround | Report in 3 weeksmade to order: Report within 6 weeks of data |