Radio, RF mesh & LoRaWANKutchvayu3 variants
SampleRadio, RF mesh & LoRaWAN Kutchvayu · KUT-C03 series
- Type
- LoRaWAN outdoor gateway to PMP base station (see variants)
- Frequency
- 433 MHz
- Output power
- 30 dBm
- Range
- 15 km LoRa
- Data rate
- 6.25 kbps LoRa
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 2 nos
SDH / MPLS & fibre terminal equipmentNarmada4 variants
SampleSDH / MPLS & fibre terminal equipment Narmada · NAR-2A7 series
- Capacity
- STM-4 to 10G MPLS-TP (see variants)
- Interface
- E1
- Optical reach
- 80 km
- Protection
- SNCP
- Wavelength
- 1550 nm
Lead time 8-10 weeks · Warranty 36 months from supply · MOQ 1 nos
Industrial routers, switches & firewallsHertzcore4 variants
SampleIndustrial routers, switches & firewalls Hertzcore · HER-622 series
- Ports
- 8 ports to 24 ports (see variants)
- Port speed
- 1G SFP + 10G uplink
- Redundancy protocol
- ERPS
- Layer
- Layer 2
- PoE
- IEEE 802.3at
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos
SDH / MPLS & fibre terminal equipmentOjasmark4 variants
SampleSDH / MPLS & fibre terminal equipment Ojasmark · OJA-2A2 series
- Capacity
- STM-4 to 10G MPLS-TP (see variants)
- Interface
- 10G Ethernet
- Optical reach
- 120 km
- Protection
- 1+1 MSP
- Wavelength
- CWDM/DWDM
Lead time 12-16 weeks · Warranty 36 months from supply · MOQ 10 nos
SDH / MPLS & fibre terminal equipmentHampineel6 variants
SampleSDH / MPLS & fibre terminal equipment Hampineel · HAM-698 series
- Capacity
- STM-1 to 100G DWDM (see variants)
- Interface
- 1G Ethernet
- Optical reach
- 120 km
- Protection
- SNCP
- Wavelength
- CWDM/DWDM
Lead time 12-16 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Industrial routers, switches & firewallsKutchvayu6 variants
SampleIndustrial routers, switches & firewalls Kutchvayu · KUT-622 series
- Ports
- 5 ports to 28 ports (see variants)
- Port speed
- 1G SFP + 10G uplink
- Redundancy protocol
- PRP/HSR
- Layer
- Layer 3
- PoE
- None
Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 2 nos
GPS clocks & time synchronisationMalwa5 variants
SampleGPS clocks & time synchronisation Malwa · MAL-9C9 series
- Output set
- NTP only to PTP + IRIG-B + PPS + serial (see variants)
- Time source
- GPS with rubidium holdover
- Accuracy
- ±1 µs
- Network protocols
- PTP IEEE 1588 v2
- PTP profile
- Default
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 10 nos
Satellite & VSATSahyadri4 variants
Sahyadri · SAH-449 series
- Antenna size
- 0.75 m to 2.4 m (see variants)
- Frequency band
- Ka-band
- BUC power
- 5 W
- Modem rate
- Up to 20 Mbps
- Antenna material
- Aluminium
Lead time 8-10 weeks · Warranty 12 months from supply · MOQ 1 set
PLCC & wave trapsKalinga4 variants
Kalinga · KAL-A06 series
- Rating / band
- Wave trap 800 A to PLCC 4 kHz channel (see variants)
- System voltage
- 132 kV
- Frequency band
- 24-500 kHz
- Inductance
- 1.0 mH
- Blocking impedance
- > 570 Ω
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 10 nos
Satellite & VSATWayanadagni5 variants
Wayanadagni · WAY-765 series
- Antenna size
- 0.75 m to 3.7 m (see variants)
- Frequency band
- C-band
- BUC power
- 10 W
- Modem rate
- Up to 20 Mbps
- Antenna material
- Offset glass-fibre reinforced
Lead time 3-5 weeks · Warranty 12 months from supply · MOQ 1 set
Industrial routers, switches & firewallsHertzcore4 variants
SampleIndustrial routers, switches & firewalls Hertzcore · HER-CD8 series
- Ports
- 8 ports to 24 ports (see variants)
- Port speed
- 10/100 Mbps
- Redundancy protocol
- MRP
- Layer
- Layer 2
- PoE
- IEEE 802.3at
Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 2 nos
Satellite & VSATNarmada5 variants
Narmada · NAR-768 series
- Antenna size
- 0.75 m to 3.7 m (see variants)
- Frequency band
- C-band
- BUC power
- 2 W
- Modem rate
- Up to 4 Mbps
- Antenna material
- Aluminium
Lead time 3-5 weeks · Warranty 24 months from commissioning · MOQ 1 set
GPS clocks & time synchronisationSahyadri5 variants
SampleGPS clocks & time synchronisation Sahyadri · SAH-A64 series
- Output set
- NTP only to PTP + IRIG-B + PPS + serial (see variants)
- Time source
- GPS with rubidium holdover
- Accuracy
- ±50 ns
- Network protocols
- NTP v4
- PTP profile
- Default
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 2 nos
Satellite & VSATHampineel5 variants
Hampineel · HAM-444 series
- Antenna size
- 0.75 m to 3.7 m (see variants)
- Frequency band
- Ku-band
- BUC power
- 2 W
- Modem rate
- Up to 4 Mbps
- Antenna material
- Aluminium
Lead time 3-5 weeks · Warranty 12 months from supply · MOQ 1 set
PLCC & wave trapsHampineel4 variants
Hampineel · HAM-A06 series
- Rating / band
- Wave trap 400 A to Wave trap 2000 A (see variants)
- System voltage
- 132 kV
- Frequency band
- 24-500 kHz
- Inductance
- 0.5 mH
- Blocking impedance
- > 570 Ω
Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Industrial routers, switches & firewallsWayanadagni6 variants
SampleIndustrial routers, switches & firewalls Wayanadagni · WAY-627 series
- Ports
- 5 ports to 28 ports (see variants)
- Port speed
- 1G SFP + 10G uplink
- Redundancy protocol
- MRP
- Layer
- Layer 3
- PoE
- IEEE 802.3at
Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 1 nos
Industrial routers, switches & firewallsNarmada4 variants
SampleIndustrial routers, switches & firewalls Narmada · NAR-F62 series
- Ports
- 5 ports to 16 ports (see variants)
- Port speed
- 10/100 Mbps
- Redundancy protocol
- ERPS
- Layer
- Layer 3
- PoE
- None
Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 1 nos
SDH / MPLS & fibre terminal equipmentHoysalavajra6 variants
SampleSDH / MPLS & fibre terminal equipment Hoysalavajra · HOY-CE4 series
- Capacity
- STM-1 to 100G DWDM (see variants)
- Interface
- STM-1 optical
- Optical reach
- 80 km
- Protection
- 1+1 MSP
- Wavelength
- CWDM/DWDM
Lead time 8-10 weeks · Warranty 24 months from commissioning · MOQ 10 nos
Industrial routers, switches & firewallsMalwa5 variants
SampleIndustrial routers, switches & firewalls Malwa · MAL-C46 series
- Ports
- 8 ports to 28 ports (see variants)
- Port speed
- 10/100/1000 Mbps
- Redundancy protocol
- ERPS
- Layer
- Layer 3
- PoE
- None
Lead time 3-4 weeks · Warranty 60 months from supply · MOQ 1 nos
SDH / MPLS & fibre terminal equipmentHampineel5 variants
SampleSDH / MPLS & fibre terminal equipment Hampineel · HAM-B19 series
- Capacity
- STM-1 to 10G MPLS-TP (see variants)
- Interface
- E1
- Optical reach
- 40 km
- Protection
- SNCP
- Wavelength
- 1550 nm
Lead time 12-16 weeks · Warranty 36 months from supply · MOQ 5 nos
SDH / MPLS & fibre terminal equipmentHampineel5 variants
SampleSDH / MPLS & fibre terminal equipment Hampineel · HAM-464 series
- Capacity
- STM-4 to 100G DWDM (see variants)
- Interface
- STM-1 optical
- Optical reach
- 120 km
- Protection
- SNCP
- Wavelength
- 1310 nm
Lead time 12-16 weeks · Warranty 24 months from commissioning · MOQ 1 nos
PLCC & wave trapsHertzcore6 variants
Hertzcore · HER-812 series
- Rating / band
- Wave trap 400 A to PLCC 8 kHz channel (see variants)
- System voltage
- 220 kV
- Frequency band
- 24-500 kHz
- Inductance
- 1.0 mH
- Blocking impedance
- > 570 Ω
Lead time 12-16 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Satellite & VSATHertzcore5 variants
Hertzcore · HER-446 series
- Antenna size
- 0.75 m to 3.7 m (see variants)
- Frequency band
- Ka-band
- BUC power
- 5 W
- Modem rate
- Up to 20 Mbps
- Antenna material
- Offset glass-fibre reinforced
Lead time 8-10 weeks · Warranty 12 months from supply · MOQ 1 set
PLCC & wave trapsOjasmark4 variants
Ojasmark · OJA-811 series
- Rating / band
- Wave trap 800 A to PLCC 4 kHz channel (see variants)
- System voltage
- 220 kV
- Frequency band
- 24-500 kHz
- Inductance
- 0.5 mH
- Blocking impedance
- > 570 Ω
Lead time 12-16 weeks · Warranty 24 months from commissioning · MOQ 1 nos