Poles (PSC, steel, tubular)Prakashtek6 variants
SamplePoles (PSC, steel, tubular) Prakashtek · PRA-376 series
- Pole length
- 8 m to 18 m (see variants)
- Type
- Swaged tubular
- Working load
- 200 kg
- Cross section
- Tapered round
- Steel grade
- Fe 410
Lead time 2-3 weeks · Warranty 24 months · MOQ 1 nos
Line monitoring (DLR, fault passage indicators)Godavari4 variants
SampleLine monitoring (DLR, fault passage indicators) Godavari · GOD-371 series
- Voltage class
- 33 kV to 220 kV (see variants)
- Device
- DLR sensor
- Measured
- Current
- Accuracy
- +/- 1 deg C
- Communication
- LoRaWAN
Lead time 8-10 weeks · Warranty 36 months · MOQ 1 nos
EarthwireGodavari5 variants
Godavari · GOD-DB3 series
- Size
- 7/3.66 mm to OPGW 48F (see variants)
- Type
- GS earthwire
- Strands
- 7
- Tensile strength
- 70 kN
- Fibres
- 12
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km
Lattice towers & monopolesKonark6 variants
SampleLattice towers & monopoles Konark · KON-CF3 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Type
- Tubular
- Circuit
- Single
- Tower type
- C 15-deg angle
- Height
- 13 m
Lead time 8-12 weeks · Warranty 12 months · MOQ 1 MT
Insulators (porcelain, polymer, glass)Tungabhadra3 variants
SampleInsulators (porcelain, polymer, glass) Tungabhadra · TUN-4F3 series
- Voltage and strength
- 33 kV 70 kN to 132 kV 90 kN (see variants)
- Material
- Silicone polymer
- Type
- Post
- Failing load
- 70 kN
- Creepage
- Anti-fog 40 mm/kV
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 nos
Insulators (porcelain, polymer, glass)Godavari4 variants
SampleInsulators (porcelain, polymer, glass) Godavari · GOD-174 series
- Voltage and strength
- 33 kV 70 kN to 220 kV 120 kN (see variants)
- Material
- Toughened glass
- Type
- Suspension
- Failing load
- 45 kN
- Creepage
- 25 mm/kV
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Poles (PSC, steel, tubular)Mahanadi4 variants
SamplePoles (PSC, steel, tubular) Mahanadi · MAH-2D3 series
- Pole length
- 8 m to 13 m (see variants)
- Type
- GRP
- Working load
- 500 kg
- Cross section
- Tapered round
- Steel grade
- Fe 540
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Line monitoring (DLR, fault passage indicators)Dhruvmax3 variants
SampleLine monitoring (DLR, fault passage indicators) Dhruvmax · DHR-AD8 series
- Voltage class
- 132 kV to 400 kV (see variants)
- Device
- Sag monitor
- Measured
- Current
- Accuracy
- +/- 1 deg C
- Communication
- LoRaWAN
Lead time 8-10 weeks · Warranty 24 months · MOQ 10 nos
Poles (PSC, steel, tubular)Awadh6 variants
SamplePoles (PSC, steel, tubular) Awadh · AWA-B53 series
- Pole length
- 8 m to 18 m (see variants)
- Type
- Rolled steel
- Working load
- 140 kg
- Cross section
- Rectangular
- Steel grade
- Fe 410
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
ACSR, AAAC & HTLS conductorsKonkangrid6 variants
SampleACSR, AAAC & HTLS conductors Konkangrid · KON-8E5 series
- Conductor
- Dog to Twin Moose (see variants)
- Type
- HTLS (ACCC)
- Stranding
- 6/1
- Aluminium area
- 520 mm2
- Overall diameter
- 21 mm
Lead time 6-8 weeks · Warranty As per contract · MOQ 2 km
Tower parts, bolts & nutsPrabhamark4 variants
SampleTower parts, bolts & nuts Prabhamark · PRA-038 series
- Bolt size
- M12 to M24 (see variants)
- Strength class
- 5.6
- Material
- High tensile steel
- Galvanising
- Hot-dip, 75 micron
- Thread
- Metric coarse
Lead time 2-4 weeks · Warranty 12 months · MOQ 1 MT
Covered conductors & LT spacersKanchi6 variants
SampleCovered conductors & LT spacers Kanchi · KAN-A62 series
- Conductor size
- 70 mm2 to 240 mm2 (see variants)
- Voltage
- 11 kV
- Conductor
- AAAC
- Insulation
- XLPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km
Lattice towers & monopolesKonark5 variants
SampleLattice towers & monopoles Konark · KON-CD1 series
- Voltage class
- 11 kV to 220 kV (see variants)
- Type
- Lattice
- Circuit
- Single
- Tower type
- A suspension
- Height
- 60 m
Lead time 14-20 weeks · Warranty As per contract · MOQ 2 MT
Lattice towers & monopolesTungabhadrajal6 variants
SampleLattice towers & monopoles Tungabhadrajal · TUN-1E8 series
- Voltage class
- 33 kV to 765 kV (see variants)
- Type
- Tubular
- Circuit
- Single
- Tower type
- A suspension
- Height
- 90 m
Lead time 14-20 weeks · Warranty 12 months · MOQ 1 MT
Poles (PSC, steel, tubular)Brahmaputrasamarth5 variants
SamplePoles (PSC, steel, tubular) Brahmaputrasamarth · BRA-2D7 series
- Pole length
- 9 m to 18 m (see variants)
- Type
- Swaged tubular
- Working load
- 300 kg
- Cross section
- Tapered round
- Steel grade
- Fe 540
Lead time 2-3 weeks · Warranty 24 months · MOQ 1 nos
Covered conductors & LT spacersPrabhamark5 variants
SampleCovered conductors & LT spacers Prabhamark · PRA-E23 series
- Conductor size
- 70 mm2 to 185 mm2 (see variants)
- Voltage
- 11 kV
- Conductor
- ACSR
- Insulation
- HDPE
- Layers
- Triple (tree wire)
Lead time 6-8 weeks · Warranty 12 months · MOQ 2 km
EarthwireMahanadi4 variants
Mahanadi · MAH-236 series
- Size
- 7/3.66 mm to OPGW 24F (see variants)
- Type
- Alumoweld
- Strands
- 19
- Tensile strength
- 110 kN
- Fibres
- 24
Lead time 3-5 weeks · Warranty 12 months · MOQ 10 km
Hardware fittings & dampersSabarmati4 variants
SampleHardware fittings & dampers Sabarmati · SAB-3A9 series
- Conductor type
- Moose to Quad Moose (see variants)
- Component
- Vibration damper
- Material
- Galvanised steel
- Rated load
- 120 kN
- Slip strength
- 95% of RBL
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Insulators (porcelain, polymer, glass)Coromandelakash6 variants
SampleInsulators (porcelain, polymer, glass) Coromandelakash · COR-D49 series
- Voltage and strength
- 11 kV 45 kN to 400 kV 160 kN (see variants)
- Material
- Silicone polymer
- Type
- Suspension
- Failing load
- 70 kN
- Creepage
- 31 mm/kV
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 nos
ACSR, AAAC & HTLS conductorsDhruvmax6 variants
SampleACSR, AAAC & HTLS conductors Dhruvmax · DHR-9A7 series
- Conductor
- Rabbit to Zebra (see variants)
- Type
- AAAC
- Stranding
- 54/7
- Aluminium area
- 50 mm2
- Overall diameter
- 21 mm
Lead time 6-8 weeks · Warranty 12 months · MOQ 5 km
Bird diverters, aviation warning spheres & anti-climbing devicesSabarmati4 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Sabarmati · SAB-0C3 series
- Conductor / size
- Spiral for 15-30 mm to 36 inch sphere (see variants)
- Material
- Hot-dip galvanised steel
- Colour
- Red and white
- Visibility
- Day and night reflective
- Fixing
- Bolted
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos
Covered conductors & LT spacersCoromandelakash4 variants
SampleCovered conductors & LT spacers Coromandelakash · COR-683 series
- Conductor size
- 50 mm2 to 120 mm2 (see variants)
- Voltage
- 33 kV
- Conductor
- ACSR
- Insulation
- HDPE
- Layers
- Single
Lead time 6-8 weeks · Warranty 12 months · MOQ 1 km
Line monitoring (DLR, fault passage indicators)Suryamax6 variants
SampleLine monitoring (DLR, fault passage indicators) Suryamax · SUR-373 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Device
- DLR sensor
- Measured
- Current
- Accuracy
- +/- 1 deg C
- Communication
- GSM / 4G
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Covered conductors & LT spacersKonkansudarshan4 variants
SampleCovered conductors & LT spacers Konkansudarshan · KON-773 series
- Conductor size
- 50 mm2 to 120 mm2 (see variants)
- Voltage
- LT 1.1 kV
- Conductor
- AAAC
- Insulation
- XLPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km