Railway traction electrification

25 kV AC traction power supply and overhead equipment (OHE) for railways and metros.

Companies offering this · 11

Listings (185)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Booster transformer, Prime 3 series

SampleTraction substations & transformers

Konarkkiran · KON-069 series

Rating
16 MVA to 50 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
55 kV (2x25)
Connection
Single-phase
Cooling
ONAN/ONAF

Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos

Price for verified buyers

by Konarkkiran Rail Electrification (Sample) · invoiced by BARREL

Request quote

V-connected traction transformer, Volt series

SampleTraction substations & transformers

Kalinga · KAL-917 series

Rating
20 MVA to 50 MVA (see variants)
Primary voltage
132 kV
Secondary voltage
2 x 27.5 kV
Connection
Auto-transformer
Cooling
ONAN/ONAF

Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 5 nos

Price on quote

by Kalinga Traction Power (Sample) · invoiced by BARREL

Request quote

Booster transformer, Titan 2 series

SampleTraction substations & transformers

Mahanadi · MAH-063 series

Rating
20 MVA to 30 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
55 kV (2x25)
Connection
Auto-transformer
Cooling
ONAN

Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos

Price for verified buyers

by Mahanadi Rail Electrification (Sample) · invoiced by BARREL

Request quote

Urjaline · URJ-6A5 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 61850

Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot

Price for verified buyers

by Urjaline Traction Systems (Sample) · invoiced by BARREL

Request quote

Cantilever assembly, Duo series

SampleOHE masts, cantilevers & catenary

Kakatiya · KAK-C23 series

Mast type
Single track mast to Portal 4-track (see variants)
Section
Fabricated lattice
Height
11.5 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos

Price on quote

by Kakatiya Rail Electrification (Sample) · invoiced by BARREL

Request quote

Wayanadjoule · WAY-6A6 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
OFC / MPLS
Protocol
IEC 60870-5-104

Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

by Wayanadjoule Traction Power (Sample) · invoiced by BARREL

Request quote

OHE mast, Titan 3 series

SampleOHE masts, cantilevers & catenary

Dhruvline · DHR-F82 series

Mast type
Single track mast to Booster mast (see variants)
Section
Fabricated lattice
Height
8 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty 12 months · MOQ 1 nos

Price for verified buyers

by Dhruvline Traction Systems (Sample) · invoiced by BARREL

Request quote

Cantilever assembly, Core series

SampleOHE masts, cantilevers & catenary

Taxila · TAX-C26 series

Mast type
Portal 2-track to Tunnel bracket (see variants)
Section
Rolled beam
Height
9.5 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos

Price for verified buyers

by Taxila Traction Systems (Sample) · invoiced by BARREL

Request quote

Catenary bracket set, Duo series

SampleOHE masts, cantilevers & catenary

Urjaline · URJ-687 series

Mast type
Double track mast to Booster mast (see variants)
Section
Tubular
Height
8 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty 12 months · MOQ 2 nos

Price for verified buyers

by Urjaline Traction Systems (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited