Traction substations & transformersKonarkkiran5 variants
SampleTraction substations & transformers Konarkkiran · KON-069 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Single-phase
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos
OHE masts, cantilevers & catenaryTaxila4 variants
SampleOHE masts, cantilevers & catenary Taxila · TAX-F56 series
- Mast type
- Portal 2-track to Booster mast (see variants)
- Section
- Fabricated lattice
- Height
- 9.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos
Traction substations & transformersKalinga4 variants
SampleTraction substations & transformers Kalinga · KAL-917 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Contact & messenger wiresWayanadjoule5 variants
SampleContact & messenger wires Wayanadjoule · WAY-7B2 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 2 km
OHE masts, cantilevers & catenaryKakatiya4 variants
SampleOHE masts, cantilevers & catenary Kakatiya · KAK-F52 series
- Mast type
- Double track mast to Tunnel bracket (see variants)
- Section
- Tubular
- Height
- 8 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos
Traction substations & transformersMahanadi3 variants
SampleTraction substations & transformers Mahanadi · MAH-063 series
- Rating
- 20 MVA to 30 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Auto-transformer
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos
Section insulators & neutral sectionsKonarkkiran3 variants
SampleSection insulators & neutral sections Konarkkiran · KON-FF7 series
- Type
- Standard section insulator to Insulated overlap (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 15 m
- Rated current
- 600 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 2 nos
Section insulators & neutral sectionsMahanadi4 variants
SampleSection insulators & neutral sections Mahanadi · MAH-FF8 series
- Type
- Neutral section to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 600 A
Lead time 8-10 weeks · Warranty 12 months · MOQ 2 nos
Traction SCADAUrjaline5 variants
Urjaline · URJ-6A5 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot
OHE masts, cantilevers & catenaryKakatiya4 variants
SampleOHE masts, cantilevers & catenary Kakatiya · KAK-C23 series
- Mast type
- Single track mast to Portal 4-track (see variants)
- Section
- Fabricated lattice
- Height
- 11.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos
Traction SCADAKakatiya4 variants
Kakatiya · KAK-D73 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 60870-5-104
Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot
Traction SCADAKakatiya4 variants
Kakatiya · KAK-EA6 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 60870-5-104
Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot
Traction SCADAWayanadjoule5 variants
Wayanadjoule · WAY-D79 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 24 months · MOQ 2 lot
Traction SCADAWayanadjoule5 variants
Wayanadjoule · WAY-6A6 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 60870-5-104
Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot
Traction SCADATaxila4 variants
Taxila · TAX-277 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 1 lot
OHE masts, cantilevers & catenaryDhruvline6 variants
SampleOHE masts, cantilevers & catenary Dhruvline · DHR-F82 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Fabricated lattice
- Height
- 8 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty 12 months · MOQ 1 nos
Traction substations & transformersKakatiya3 variants
SampleTraction substations & transformers Kakatiya · KAK-567 series
- Rating
- 20 MVA to 30 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Scott
- Cooling
- ONAN/ONAF
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Contact & messenger wiresMahanadifaraday5 variants
SampleContact & messenger wires Mahanadifaraday · MAH-0F8 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Copper silver
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 km
OHE masts, cantilevers & catenaryTaxila3 variants
SampleOHE masts, cantilevers & catenary Taxila · TAX-C26 series
- Mast type
- Portal 2-track to Tunnel bracket (see variants)
- Section
- Rolled beam
- Height
- 9.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos
OHE masts, cantilevers & catenaryUrjaline5 variants
SampleOHE masts, cantilevers & catenary Urjaline · URJ-687 series
- Mast type
- Double track mast to Booster mast (see variants)
- Section
- Tubular
- Height
- 8 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty 12 months · MOQ 2 nos
Section insulators & neutral sectionsMahanadi5 variants
SampleSection insulators & neutral sections Mahanadi · MAH-2A6 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 5 nos
Section insulators & neutral sectionsKakatiya4 variants
SampleSection insulators & neutral sections Kakatiya · KAK-2A4 series
- Type
- Neutral section to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Polymer
- Length
- 18 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 10 nos
Traction substations & transformersWayanadjoule5 variants
SampleTraction substations & transformers Wayanadjoule · WAY-914 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 27.5 kV
- Connection
- V-V
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 10 nos
Contact & messenger wiresSabarmati5 variants
SampleContact & messenger wires Sabarmati · SAB-0F6 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 4-6 weeks · Warranty 12 months · MOQ 2 km