Drop-out fuses & HRC fuse unitsIndraprastha3 variants
SampleDrop-out fuses & HRC fuse units Indraprastha · IND-F52 series
- Rating
- 11 kV 100 A to 24 kV 100 A (see variants)
- Insulator
- Porcelain
- Rated voltage
- 24 kV
- Interrupting capacity
- 16 kA
- Fuse tube
- Fibre-lined
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
Service connections & meter boxesJhelum3 variants
SampleService connections & meter boxes Jhelum · JHE-0A8 series
- Capacity
- 2 meters to 6 meters (see variants)
- Material
- Polycarbonate
- Phase
- Single phase
- Meter type
- Whole-current
- Degree of protection
- IP65
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 nos
Load-break & AB switchesIndraprastha5 variants
SampleLoad-break & AB switches Indraprastha · IND-DF9 series
- Rating
- 11 kV 400 A to 33 kV 800 A (see variants)
- Switch type
- Isolator with earth blade
- Operation
- Motor operated
- Mounting
- Pole top
- Poles
- 3P
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 set
Auto-reclosers & sectionalisersMalwa5 variants
SampleAuto-reclosers & sectionalisers Malwa · MAL-B06 series
- Rating
- 11 kV 400 A 12.5 kA to 33 kV 630 A 12.5 kA (see variants)
- Device type
- Sectionaliser
- Interrupting medium
- SF6
- Insulation
- SF6
- Mounting
- Pole mounted
Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 2 nos
Load-break & AB switchesPataliputra6 variants
SampleLoad-break & AB switches Pataliputra · PAT-F31 series
- Rating
- 11 kV 200 A to 33 kV 800 A (see variants)
- Switch type
- Isolator with earth blade
- Operation
- Motor operated
- Mounting
- Horizontal
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 2 set
Auto-reclosers & sectionalisersSahyadrisurya5 variants
SampleAuto-reclosers & sectionalisers Sahyadrisurya · SAH-712 series
- Rating
- 11 kV 400 A 12.5 kA to 33 kV 630 A 12.5 kA (see variants)
- Device type
- Recloser
- Interrupting medium
- Vacuum
- Insulation
- Solid dielectric
- Mounting
- Substation structure
Lead time 10-12 weeks · Warranty 36 months from supply · MOQ 10 nos
Drop-out fuses & HRC fuse unitsJhelum5 variants
SampleDrop-out fuses & HRC fuse units Jhelum · JHE-F53 series
- Rating
- 11 kV 100 A to 33 kV 200 A (see variants)
- Insulator
- Silicone polymer
- Rated voltage
- 36 kV
- Interrupting capacity
- 8 kA
- Fuse tube
- Fibre-lined
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 5 nos
Drop-out fuses & HRC fuse unitsDwaraka5 variants
SampleDrop-out fuses & HRC fuse units Dwaraka · DWA-459 series
- Rating
- 11 kV 100 A to 33 kV 200 A (see variants)
- Insulator
- Porcelain
- Rated voltage
- 12 kV
- Interrupting capacity
- 12.5 kA
- Fuse tube
- Fibre-lined
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 10 nos
Drop-out fuses & HRC fuse unitsVindhya5 variants
SampleDrop-out fuses & HRC fuse units Vindhya · VIN-746 series
- Rating
- 11 kV 100 A to 33 kV 200 A (see variants)
- Insulator
- Porcelain
- Rated voltage
- 24 kV
- Interrupting capacity
- 16 kA
- Fuse tube
- Fibre-lined
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Drop-out fuses & HRC fuse unitsVindhya5 variants
SampleDrop-out fuses & HRC fuse units Vindhya · VIN-B88 series
- Rating
- 11 kV 100 A to 33 kV 200 A (see variants)
- Insulator
- Porcelain
- Rated voltage
- 36 kV
- Interrupting capacity
- 12.5 kA
- Fuse tube
- Fibre-lined
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos
Service connections & meter boxesPataliputra4 variants
SampleService connections & meter boxes Pataliputra · PAT-6E3 series
- Capacity
- 1 meter to 6 meters (see variants)
- Material
- SMC / FRP
- Phase
- Single phase
- Meter type
- CT-operated
- Degree of protection
- IP65
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 nos
Service connections & meter boxesVindhya6 variants
SampleService connections & meter boxes Vindhya · VIN-B55 series
- Capacity
- 1 meter to 12 meters (see variants)
- Material
- Polycarbonate
- Phase
- Single phase
- Meter type
- Smart / prepaid
- Degree of protection
- IP54
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 nos
Feeder pillars & LT distribution boxesMalwa3 variants
SampleFeeder pillars & LT distribution boxes Malwa · MAL-C06 series
- Rating
- 630 A to 1250 A (see variants)
- Enclosure material
- CRCA sheet steel
- Ways
- 2-way
- Busbar
- Aluminium
- Incomer
- MCCB
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Feeder pillars & LT distribution boxesIndraprastha5 variants
SampleFeeder pillars & LT distribution boxes Indraprastha · IND-413 series
- Rating
- 200 A to 1250 A (see variants)
- Enclosure material
- SMC / FRP
- Ways
- 8-way
- Busbar
- Aluminium
- Incomer
- MCCB
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Drop-out fuses & HRC fuse unitsVindhya3 variants
SampleDrop-out fuses & HRC fuse units Vindhya · VIN-EA5 series
- Rating
- 11 kV 100 A to 24 kV 100 A (see variants)
- Insulator
- Porcelain
- Rated voltage
- 36 kV
- Interrupting capacity
- 12.5 kA
- Fuse tube
- Epoxy-glass with fibre liner
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Feeder pillars & LT distribution boxesDwaraka4 variants
SampleFeeder pillars & LT distribution boxes Dwaraka · DWA-692 series
- Rating
- 400 A to 1250 A (see variants)
- Enclosure material
- Stainless steel
- Ways
- 4-way
- Busbar
- Copper
- Incomer
- Switch-fuse
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Feeder pillars & LT distribution boxesVindhya6 variants
SampleFeeder pillars & LT distribution boxes Vindhya · VIN-9E6 series
- Rating
- 100 A to 1250 A (see variants)
- Enclosure material
- CRCA sheet steel
- Ways
- 6-way
- Busbar
- Aluminium
- Incomer
- Switch-fuse
Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 5 nos
Auto-reclosers & sectionalisersSahyadrisurya6 variants
SampleAuto-reclosers & sectionalisers Sahyadrisurya · SAH-AD5 series
- Rating
- 11 kV 400 A 12.5 kA to 33 kV 630 A 16 kA (see variants)
- Device type
- Recloser
- Interrupting medium
- Vacuum
- Insulation
- Solid dielectric
- Mounting
- Substation structure
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos
Pole hardware, stays & cross-armsMalwa5 variants
SamplePole hardware, stays & cross-arms Malwa · MAL-808 series
- Size
- 75x40 mm to 150x75 mm (see variants)
- Hardware item
- Cross-arm
- Material
- Mild steel to IS 2062
- Section
- Channel
- Length
- 1.2 m
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 nos
Drop-out fuses & HRC fuse unitsSahyadrisurya5 variants
SampleDrop-out fuses & HRC fuse units Sahyadrisurya · SAH-741 series
- Rating
- 11 kV 100 A to 33 kV 200 A (see variants)
- Insulator
- Porcelain
- Rated voltage
- 12 kV
- Interrupting capacity
- 12.5 kA
- Fuse tube
- Fibre-lined
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
Auto-reclosers & sectionalisersNalanda4 variants
SampleAuto-reclosers & sectionalisers Nalanda · NAL-F26 series
- Rating
- 11 kV 630 A 16 kA to 33 kV 630 A 12.5 kA (see variants)
- Device type
- Sectionaliser
- Interrupting medium
- Vacuum
- Insulation
- SF6
- Mounting
- Pole mounted
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 2 nos
Service connections & meter boxesVindhya3 variants
SampleService connections & meter boxes Vindhya · VIN-629 series
- Capacity
- 6 meters to 12 meters (see variants)
- Material
- CRCA steel
- Phase
- Single phase
- Meter type
- Whole-current
- Degree of protection
- IP54
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 2 nos
Pole hardware, stays & cross-armsSahyadrisurya5 variants
SamplePole hardware, stays & cross-arms Sahyadrisurya · SAH-A57 series
- Size
- 100x50 mm to 200x100 mm (see variants)
- Hardware item
- Pole clamp
- Material
- High tensile steel
- Section
- Channel
- Length
- 1.8 m
Lead time 4-5 weeks · Warranty As per discom specification · MOQ 1 nos
Load-break & AB switchesSahyadrisurya5 variants
SampleLoad-break & AB switches Sahyadrisurya · SAH-D33 series
- Rating
- 11 kV 400 A to 33 kV 800 A (see variants)
- Switch type
- Isolator with earth blade
- Operation
- Motor operated
- Mounting
- Vertical
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 5 set