Pole hardware, stays & cross-armsVindhya6 variants
SamplePole hardware, stays & cross-arms Vindhya · VIN-A54 series
- Size
- 75x40 mm to 200x100 mm (see variants)
- Hardware item
- Stay set
- Material
- Mild steel to IS 2062
- Section
- Flat
- Length
- 1.2 m
Lead time 2-3 weeks · Warranty As per discom specification · MOQ 1 nos
Load-break & AB switchesNalanda6 variants
SampleLoad-break & AB switches Nalanda · NAL-DF5 series
- Rating
- 11 kV 200 A to 33 kV 800 A (see variants)
- Switch type
- Load-break switch
- Operation
- Motor operated
- Mounting
- Pole top
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 10 set
Auto-reclosers & sectionalisersJhelum6 variants
SampleAuto-reclosers & sectionalisers Jhelum · JHE-714 series
- Rating
- 11 kV 400 A 12.5 kA to 33 kV 630 A 16 kA (see variants)
- Device type
- Sectionaliser
- Interrupting medium
- SF6
- Insulation
- Silicone rubber
- Mounting
- Substation structure
Lead time 10-12 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Auto-reclosers & sectionalisersKakatiya4 variants
SampleAuto-reclosers & sectionalisers Kakatiya · KAK-AD8 series
- Rating
- 11 kV 400 A 12.5 kA to 22 kV 630 A 16 kA (see variants)
- Device type
- Recloser
- Interrupting medium
- SF6
- Insulation
- SF6
- Mounting
- Pole mounted
Lead time 10-12 weeks · Warranty 36 months from supply · MOQ 1 nos
Load-break & AB switchesNarmadasetu6 variants
SampleLoad-break & AB switches Narmadasetu · NAR-D38 series
- Rating
- 11 kV 200 A to 33 kV 800 A (see variants)
- Switch type
- AB switch
- Operation
- Gang operated manual
- Mounting
- Pole top
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 set
Feeder pillars & LT distribution boxesVindhya4 variants
SampleFeeder pillars & LT distribution boxes Vindhya · VIN-C02 series
- Rating
- 200 A to 800 A (see variants)
- Enclosure material
- Galvanised steel
- Ways
- 8-way
- Busbar
- Copper
- Incomer
- MCCB
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Auto-reclosers & sectionalisersJhelum6 variants
SampleAuto-reclosers & sectionalisers Jhelum · JHE-F23 series
- Rating
- 11 kV 400 A 12.5 kA to 33 kV 630 A 16 kA (see variants)
- Device type
- Sectionaliser
- Interrupting medium
- SF6
- Insulation
- Silicone rubber
- Mounting
- Substation structure
Lead time 10-12 weeks · Warranty 36 months from supply · MOQ 2 nos
Pole hardware, stays & cross-armsSahyadrisurya6 variants
SamplePole hardware, stays & cross-arms Sahyadrisurya · SAH-0F6 series
- Size
- 75x40 mm to 200x100 mm (see variants)
- Hardware item
- Guy insulator
- Material
- High tensile steel
- Section
- Flat
- Length
- 1.8 m
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 1 nos
Feeder pillars & LT distribution boxesMalwa5 variants
SampleFeeder pillars & LT distribution boxes Malwa · MAL-413 series
- Rating
- 100 A to 800 A (see variants)
- Enclosure material
- SMC / FRP
- Ways
- 4-way
- Busbar
- Copper
- Incomer
- MCCB
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Auto-reclosers & sectionalisersDeccanhertz4 variants
SampleAuto-reclosers & sectionalisers Deccanhertz · DEC-716 series
- Rating
- 11 kV 400 A 12.5 kA to 22 kV 630 A 16 kA (see variants)
- Device type
- Recloser
- Interrupting medium
- SF6
- Insulation
- Solid dielectric
- Mounting
- Pole mounted
Lead time 10-12 weeks · Warranty 36 months from supply · MOQ 1 nos
Load-break & AB switchesNarmadasetu6 variants
SampleLoad-break & AB switches Narmadasetu · NAR-DF4 series
- Rating
- 11 kV 200 A to 33 kV 800 A (see variants)
- Switch type
- Isolator with earth blade
- Operation
- Motor operated
- Mounting
- Pole top
- Poles
- 3P
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 set
Load-break & AB switchesPataliputra4 variants
SampleLoad-break & AB switches Pataliputra · PAT-869 series
- Rating
- 11 kV 400 A to 33 kV 630 A (see variants)
- Switch type
- Isolator with earth blade
- Operation
- Hookstick
- Mounting
- Pole top
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 10 set
Pole hardware, stays & cross-armsSahyadrisurya4 variants
SamplePole hardware, stays & cross-arms Sahyadrisurya · SAH-A27 series
- Size
- 100x75 mm to 200x100 mm (see variants)
- Hardware item
- Bracket
- Material
- High tensile steel
- Section
- Flat
- Length
- 1.2 m
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 5 nos
Pole hardware, stays & cross-armsNalanda5 variants
SamplePole hardware, stays & cross-arms Nalanda · NAL-0F5 series
- Size
- 75x40 mm to 150x75 mm (see variants)
- Hardware item
- Stay set
- Material
- Mild steel to IS 2062
- Section
- Flat
- Length
- 2.4 m
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 2 nos
Pole hardware, stays & cross-armsVindhya4 variants
SamplePole hardware, stays & cross-arms Vindhya · VIN-EC1 series
- Size
- 100x75 mm to 200x100 mm (see variants)
- Hardware item
- Pole clamp
- Material
- High tensile steel
- Section
- Flat
- Length
- 3.0 m
Lead time 2-3 weeks · Warranty As per discom specification · MOQ 1 nos
Drop-out fuses & HRC fuse unitsIndraprastha5 variants
SampleDrop-out fuses & HRC fuse units Indraprastha · IND-458 series
- Rating
- 11 kV 100 A to 33 kV 200 A (see variants)
- Insulator
- Silicone polymer
- Rated voltage
- 12 kV
- Interrupting capacity
- 16 kA
- Fuse tube
- Fibre-lined
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 nos
Drop-out fuses & HRC fuse unitsDeccanhertz3 variants
SampleDrop-out fuses & HRC fuse units Deccanhertz · DEC-457 series
- Rating
- 11 kV 200 A to 33 kV 100 A (see variants)
- Insulator
- Silicone polymer
- Rated voltage
- 36 kV
- Interrupting capacity
- 8 kA
- Fuse tube
- Epoxy-glass with fibre liner
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 5 nos
Pole hardware, stays & cross-armsMalwa6 variants
SamplePole hardware, stays & cross-arms Malwa · MAL-0F4 series
- Size
- 75x40 mm to 200x100 mm (see variants)
- Hardware item
- Cross-arm
- Material
- Mild steel to IS 2062
- Section
- Flat
- Length
- 3.0 m
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 1 nos
Drop-out fuses & HRC fuse unitsNalanda5 variants
SampleDrop-out fuses & HRC fuse units Nalanda · NAL-EA7 series
- Rating
- 11 kV 100 A to 33 kV 200 A (see variants)
- Insulator
- Silicone polymer
- Rated voltage
- 24 kV
- Interrupting capacity
- 8 kA
- Fuse tube
- Fibre-lined
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 1 nos
Feeder pillars & LT distribution boxesJhelum5 variants
SampleFeeder pillars & LT distribution boxes Jhelum · JHE-BE9 series
- Rating
- 100 A to 800 A (see variants)
- Enclosure material
- CRCA sheet steel
- Ways
- 6-way
- Busbar
- Copper
- Incomer
- ACB
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Service connections & meter boxesVindhya3 variants
SampleService connections & meter boxes Vindhya · VIN-528 series
- Capacity
- 1 meter to 4 meters (see variants)
- Material
- Polycarbonate
- Phase
- Three phase
- Meter type
- Smart / prepaid
- Degree of protection
- IP65
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
Feeder pillars & LT distribution boxesNalanda6 variants
SampleFeeder pillars & LT distribution boxes Nalanda · NAL-BE2 series
- Rating
- 100 A to 1250 A (see variants)
- Enclosure material
- Stainless steel
- Ways
- 8-way
- Busbar
- Aluminium
- Incomer
- MCCB
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 1 nos
Load-break & AB switchesMalwa4 variants
SampleLoad-break & AB switches Malwa · MAL-D36 series
- Rating
- 11 kV 630 A to 33 kV 800 A (see variants)
- Switch type
- Load-break switch
- Operation
- Motor operated
- Mounting
- Vertical
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 5 set
Auto-reclosers & sectionalisersPataliputra4 variants
SampleAuto-reclosers & sectionalisers Pataliputra · PAT-B08 series
- Rating
- 11 kV 630 A 16 kA to 33 kV 630 A 12.5 kA (see variants)
- Device type
- Recloser
- Interrupting medium
- Vacuum
- Insulation
- Solid dielectric
- Mounting
- Substation structure
Lead time 10-12 weeks · Warranty 36 months from supply · MOQ 1 nos