HVAC & ventilationArcmark3 variants
Arcmark · ARC-2F4 series
- Capacity
- 3 TR to 8 TR (see variants)
- Type
- Precision
- Refrigerant
- R410A
- Power supply
- 415 V 3 phase
- Compressor
- Scroll
Lead time 1-2 weeks · Warranty 12 months comprehensive · MOQ 5 nos
Corrosion monitoringWattsys4 variants
SampleCorrosion monitoring Wattsys · WAT-001 series
- Channel count
- 2 channel to 16 channel (see variants)
- Measurement
- Linear polarisation resistance
- Range
- 0-2 V
- Accuracy
- +/-2%
- Logging interval
- 1 min
Lead time 2-3 weeks · Warranty 24 months with calibration · MOQ 1 set
Corrosion monitoringNanditek4 variants
SampleCorrosion monitoring Nanditek · NAN-0B3 series
- Channel count
- 2 channel to 16 channel (see variants)
- Measurement
- Linear polarisation resistance
- Range
- 0-2 V
- Accuracy
- +/-2%
- Logging interval
- 1 h
Lead time 2-3 weeks · Warranty 24 months with calibration · MOQ 2 set
Piles & foundationsKaverigrid3 variants
SamplePiles & foundations Kaverigrid · KAV-8D9 series
- Pile diameter
- 450 mm to 750 mm (see variants)
- Pile type
- Bored cast-in-situ
- Concrete grade
- M35
- Pile length
- 18 m
- Reinforcement
- Fe 500D
Lead time 2-3 weeks · Warranty 12 months against workmanship · MOQ 1 nos
Flue-gas desulphurisation (FGD)Akshaymark3 variants
SampleFlue-gas desulphurisation (FGD) Akshaymark · AKS-2E6 series
- Boiler size
- 210 MW to 500 MW (see variants)
- Technology
- Wet limestone-gypsum
- SO2 removal efficiency
- 80%
- Inlet SO2
- Up to 1500 mg/Nm3
- Absorber material
- Alloy lined
Lead time 40-60 weeks · Warranty 12 months from commissioning · MOQ 1 set
Impressed-current & sacrificial-anode CPNarmada3 variants
SampleImpressed-current & sacrificial-anode CP Narmada · NAR-129 series
- TR unit rating
- 12 V 10 A to 50 V 25 A (see variants)
- System type
- Galvanic
- Anode material
- Magnesium 17 lb
- Cooling
- Air cooled
- Output
- Constant current
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 5 set
Corrosion monitoringKakatiyatej3 variants
SampleCorrosion monitoring Kakatiyatej · KAK-599 series
- Channel count
- 4 channel to 16 channel (see variants)
- Measurement
- Pipe-to-soil potential
- Range
- 0-20 mm/year
- Accuracy
- +/-1 mV
- Logging interval
- 1 h
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 1 set
Water testing laboratoriesSudarshangen4 variants
SampleServiceWater testing laboratories Sudarshangen · SUD-308 series
- Parameter panel
- Basic 10 parameters to Heavy metals panel (see variants)
- Sample type
- Wastewater
- Reporting
- Digital report
- Accreditation
- NABL accredited
- Turnaround
- 7 days
Lead time 3-5 days · Warranty Report valid for the sampled lot · MOQ 1 job
Geotextiles & slope protectionWayanad4 variants
SampleGeotextiles & slope protection Wayanad · WAY-9D7 series
- Mass per unit area
- 200 gsm to 600 gsm (see variants)
- Material
- HDPE
- Construction
- Geocell
- Roll width
- 6 m
- Roll length
- 50 m
Lead time 3 weeks · Warranty 12 months from supply · MOQ 1 sq m
Valves, pipes & fittingsShivalikprakash5 variants
SampleValves, pipes & fittings Shivalikprakash · SHI-4B8 series
- Nominal bore
- 80 NB to 300 NB (see variants)
- Body material
- Stainless steel CF8M
- Pressure class
- PN 10
- End connection
- Flanged
- Operation
- Gear operated
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 nos
EOT & gantry cranes, hoistsArcmark4 variants
SampleEOT & gantry cranes, hoists Arcmark · ARC-7F6 series
- Capacity
- 5 t to 32 t (see variants)
- Span
- 15 m
- Duty class
- M5
- Hoisting speed
- 5/0.8 m/min
- Lift height
- 9 m
Lead time 6-8 weeks · Warranty 18 months from supply · MOQ 1 nos
RO & DM plantsBetwafaraday3 variants
Betwafaraday · BET-437 series
- Permeate capacity
- 10 cu m/h to 50 cu m/h (see variants)
- Recovery
- 75%
- Membrane
- 8 inch TFC
- Feed TDS
- Up to 2000 ppm
- Permeate conductivity
- Below 0.2 microS/cm DM
Lead time 8-10 weeks · Warranty 6 months on membranes · MOQ 5 set
CEMS & ambient air monitoringAwadhshikhar3 variants
SampleCEMS & ambient air monitoring Awadhshikhar · AWA-101 series
- Parameters monitored
- PM + SO2 to PM + SO2 + NOx + O2 (see variants)
- Measurement method
- Extractive hot-wet
- Particulate sensor
- Opacity
- Gas analyser
- NDIR
- Data logging
- 4-20 mA
Lead time 10-14 weeks · Warranty 24 months on analysers · MOQ 5 set
SCR / SNCR NOx controlMahanadi6 variants
SampleSCR / SNCR NOx control Mahanadi · MAH-454 series
- Flue gas flow
- 20000 Nm3/h to 1000000 Nm3/h (see variants)
- Technology
- SCR
- NOx removal efficiency
- 40%
- Reagent
- Ammonia 25%
- Catalyst
- Plate type
Lead time 16-24 weeks · Warranty 12 months from commissioning · MOQ 10 set
Transformer plinths, oil pits & soak pitsTejgen4 variants
SampleServiceTransformer plinths, oil pits & soak pits Tejgen · TEJ-B81 series
- Transformer rating served
- 10 MVA to 100 MVA (see variants)
- Concrete grade
- M25
- Oil pit capacity
- 150% of oil volume
- Pit fill
- Gravel 400 mm
- Pit waterproofing
- Integral waterproofing
Lead time 4-6 weeks · Warranty 12 months defect liability · MOQ 1 nos
Conveyors & material handlingJhelum4 variants
SampleConveyors & material handling Jhelum · JHE-C48 series
- Belt width
- 400 mm to 800 mm (see variants)
- Belt type
- PVC
- Capacity
- 50 TPH
- Belt speed
- 1.0 m/s
- Idler pitch
- 1.2 m
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 m
Steel structuresChambalgrid3 variants
Chambalgrid · CHA-D96 series
- Structure weight class
- 2 MT lot to 10 MT lot (see variants)
- Material grade
- IS 2062 E350 BR
- Galvanising coating
- 85 micron min
- Section type
- Mixed
- Bolt grade
- 10.9
Lead time 3-4 weeks · Warranty 24 months against coating failure · MOQ 1 MT
EOT & gantry cranes, hoistsArcmark5 variants
SampleEOT & gantry cranes, hoists Arcmark · ARC-E87 series
- Capacity
- 3 t to 32 t (see variants)
- Span
- 10 m
- Duty class
- M5
- Hoisting speed
- 8 m/min
- Lift height
- 12 m
Lead time 10-12 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Ash utilisationMahanadi5 variants
Mahanadi · MAH-466 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 400 sq m/kg (see variants)
- Source
- Pond ash
- Grade
- Siliceous Grade 1
- Loss on ignition
- Below 5%
- Moisture
- Below 5%
Lead time 3-7 days · Warranty Test certificate per lot · MOQ 1 MT
Effluent & sewage treatment (ETP / STP)Dwarakaprakash6 variants
SampleEffluent & sewage treatment (ETP / STP) Dwarakaprakash · DWA-543 series
- Capacity
- 10 KLD to 500 KLD (see variants)
- Process
- SBR
- Tank material
- RCC
- Treated BOD
- Below 20 mg/l
- Blower
- Twin lobe
Lead time 8-12 weeks · Warranty 12 months from commissioning · MOQ 2 set
RO & DM plantsDwarakaprakash3 variants
Dwarakaprakash · DWA-451 series
- Permeate capacity
- 25 cu m/h to 100 cu m/h (see variants)
- Recovery
- 60%
- Membrane
- 4 inch TFC
- Feed TDS
- Up to 5000 ppm
- Permeate conductivity
- Below 0.2 microS/cm DM
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 set
Air compressors & dryersArcmark3 variants
SampleAir compressors & dryers Arcmark · ARC-333 series
- Motor rating
- 22 kW to 55 kW (see variants)
- Working pressure
- 13 bar
- Free air delivery
- 1.2 cu m/min
- Type
- Oil-injected screw
- Drive
- VFD
Lead time 4-6 weeks · Warranty 24 months airend · MOQ 1 nos
Noise controlDeccanvolt3 variants
Deccanvolt · DEC-341 series
- Insertion loss
- 15 dB to 25 dB (see variants)
- Equipment served
- Transformer
- Panel construction
- Double skin MS
- Infill
- Rockwool 100 mm
- Sheet thickness
- 2.0 mm
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 2 nos
Hot-dip galvanisingMalabarprakash6 variants
SampleServiceHot-dip galvanising Malabarprakash · MAL-FF2 series
- Minimum zinc coating
- 70 micron to 900 g/sq m (see variants)
- Item type
- Nuts and bolts
- Max piece length
- 12 m
- Bath size
- 14 x 1.8 x 3.5 m
- Zinc purity
- 99.95%
Lead time 1-2 weeks · Warranty Coating conforms to IS 4759 · MOQ 1 MT