Live-line & hot-stick toolsPataliputra5 variants
SampleLive-line & hot-stick tools Pataliputra · PAT-397 series
- Rated voltage
- 33 kV to 400 kV (see variants)
- Material
- FRP pultruded
- Length
- 3 m
- Type
- Fixed
- Head fittings
- Clamp stick
Lead time 1-2 weeks · Warranty Re-test every 6 months recommended · MOQ 5 nos
Aerial work platforms & boom liftsDoaba6 variants
SampleFor rentAerial work platforms & boom lifts Doaba · DOA-4E4 series
- Working height
- 8 m scissor to 32 m insulated bucket (see variants)
- Platform capacity
- 230 kg
- Drive
- Hybrid
- Outreach
- 16 m
- Insulation
- Not insulated
Lead time 1-2 days · Warranty Breakdown replacement within 24 h · MOQ 1 nos
Partial discharge & VLF testersNarmadaphase3 variants
SamplePartial discharge & VLF testers Narmadaphase · NAR-332 series
- Test voltage (VLF peak)
- 60 kV to 90 kV (see variants)
- Test frequency
- 0.1 Hz
- Waveform
- Sinusoidal
- Max load capacitance
- 1.1 microF
- PD sensitivity
- Below 1 pC
Lead time 4-6 weeks · Warranty 24 months with calibration · MOQ 1 set
Cable drum jacks & trailersFluxcore6 variants
SampleCable drum jacks & trailers Fluxcore · FLU-4A8 series
- Drum capacity
- 1 t to 12 t (see variants)
- Maximum drum diameter
- 2.8 m
- Maximum drum width
- 1 m
- Axle
- Tandem
- Jack type
- Mechanical screw
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 5 nos
Partial discharge & VLF testersSetucore5 variants
SamplePartial discharge & VLF testers Setucore · SET-597 series
- Test voltage (VLF peak)
- 34 kV to 90 kV (see variants)
- Test frequency
- 0.05 Hz to 0.1 Hz
- Waveform
- Cosine rectangular
- Max load capacitance
- 0.5 microF
- PD sensitivity
- Below 5 pC
Lead time 8-14 weeks · Warranty 24 months with calibration · MOQ 1 set
CT/PT & transformer analysersPushpakline4 variants
SampleCT/PT & transformer analysers Pushpakline · PUS-099 series
- Test channels / output
- Single channel 2 kV to 3-phase 10 kV (see variants)
- Tests
- Knee point, excitation
- Class tested
- Class 0.2 to 5P
- Output current
- 0-30 A
- Output voltage
- 0-2000 V
Lead time 2-3 weeks · Warranty 24 months with calibration · MOQ 10 nos
Cable pulling winches & rollersCoromandel3 variants
SampleCable pulling winches & rollers Coromandel · COR-399 series
- Pull capacity
- 1 t to 3 t (see variants)
- Drive
- Electric
- Line speed
- 15 m/min
- Wire rope length
- 50 m
- Motor power
- 7.5 kW
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 nos
DG & equipment rentalSatavahana6 variants
SampleFor rentDG & equipment rental Satavahana · SAT-A31 series
- DG capacity
- 30 kVA to 1010 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Included
- Enclosure
- CPCB IV+ canopy
- Operator
- Not included
Lead time 2-3 days · Warranty Replacement within 48 h · MOQ 1 nos
Insulated hand tools (1000 V)Mewar6 variants
SampleInsulated hand tools (1000 V) Mewar · MEW-491 series
- Kit size
- 5 pieces to 40 pieces (see variants)
- Rated voltage
- 1000 V AC
- Material
- Chrome molybdenum
- Insulation
- Dual layer injection moulded
- Handle colour
- Red and yellow
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 set
Transformer oil filtration plantsSabarmatitamra5 variants
SampleFor rentTransformer oil filtration plants Sabarmatitamra · SAB-E92 series
- Flow rate
- 600 lph to 12000 lph (see variants)
- Vacuum level
- Below 1 mbar
- Heater power
- 36 kW
- Outlet moisture
- Below 3 ppm
- Outlet BDV
- Above 80 kV
Lead time 1-3 days · Warranty Replacement unit within 48 h · MOQ 1 nos
Relay test kitsShaktimark3 variants
Shaktimark · SHA-B53 series
- Output channels
- 3 voltage + 3 current to 6 voltage + 6 current (see variants)
- Current output
- 32 A per channel
- Voltage output
- 0-150 V
- Frequency range
- DC to 1 kHz
- Accuracy
- 0.1%
Lead time 6-10 weeks · Warranty 24 months extended option · MOQ 1 set
Cable drum jacks & trailersMewar6 variants
SampleCable drum jacks & trailers Mewar · MEW-181 series
- Drum capacity
- 1 t to 12 t (see variants)
- Maximum drum diameter
- 1.8 m
- Maximum drum width
- 1 m
- Axle
- Tandem
- Jack type
- Mechanical screw
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 2 nos
SFRA, winding resistance & turns-ratio testersKamrupsamarth6 variants
SampleSFRA, winding resistance & turns-ratio testers Kamrupsamarth · KAM-366 series
- Test current / range
- 1 A winding resistance to SFRA 20 Hz-2 MHz (see variants)
- Instrument
- Winding resistance
- Accuracy
- 0.5%
- Frequency range
- 20 Hz to 2 MHz
- Dynamic range
- Over 100 dB
Lead time 6-10 weeks · Warranty 12 months from supply · MOQ 10 nos
Pile drivers & augersBrahmaputraagni5 variants
SampleFor rentPile drivers & augers Brahmaputraagni · BRA-BC9 series
- Rig capacity
- Hydraulic hammer 3 t to Rotary rig 300 kNm (see variants)
- Pile diameter
- Up to 1500 mm
- Depth capacity
- 3 m
- Operator
- Not included
- Crew
- Operator + 2 helpers
Lead time 1-2 weeks · Warranty Breakdown replacement within 72 h · MOQ 1 nos
Live-line & hot-stick toolsMysoresarvam3 variants
SampleLive-line & hot-stick tools Mysoresarvam · MYS-F97 series
- Rated voltage
- 33 kV to 132 kV (see variants)
- Material
- FRP pultruded
- Length
- 3 m
- Type
- Insulating ladder
- Head fittings
- Clamp stick
Lead time 1-2 weeks · Warranty Re-test every 6 months recommended · MOQ 10 nos
Insulation & tan delta testersHoysala5 variants
SampleInsulation & tan delta testers Hoysala · HOY-DF5 series
- Maximum test voltage
- 1 kV to 12 kV (see variants)
- Resistance range
- Up to 15 Tohm
- Tests
- IR, PI, DAR
- Display
- Colour TFT
- Power supply
- Rechargeable battery
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Tower erection gin poles & derricksTeesta4 variants
SampleTower erection gin poles & derricks Teesta · TEE-484 series
- Safe working load
- 500 kg to 3 t (see variants)
- Pole type
- Tubular telescopic
- Pole length
- 24 m
- Material
- MS galvanised
- Winch
- Hand
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 set
Multimeters, clamp meters & insulation testersMalwa5 variants
SampleMultimeters, clamp meters & insulation testers Malwa · MAL-BD8 series
- Maximum current / voltage range
- 600 A to 3000 A (flexible) (see variants)
- Measurement
- Capacitance
- Display count
- 6000
- Accuracy
- 1%
- Safety rating
- CAT III 600 V
Lead time 3-7 days · Warranty 3 years limited · MOQ 5 nos
Cable pulling winches & rollersAwadhanant4 variants
SampleCable pulling winches & rollers Awadhanant · AWA-C51 series
- Pull capacity
- 1 t to 5 t (see variants)
- Drive
- Hand ratchet
- Line speed
- 15 m/min
- Wire rope length
- 100 m
- Motor power
- 7.5 kW
Lead time 4-6 weeks · Warranty 12 months from supply · MOQ 5 nos
Survey & inspection dronesAravali5 variants
SampleFor rentSurvey & inspection drones Aravali · ARA-FC5 series
- Drone class
- RTK mapping to Fixed wing 100 sq km (see variants)
- Sensor
- Radiometric thermal
- Positioning
- PPK
- Flight time
- 45 min
- Pilot
- DGCA licensed remote pilot
Lead time 1 week · Warranty Re-flight at no charge if data unusable · MOQ 1 nos
Cable drum jacks & trailersKaveri6 variants
SampleCable drum jacks & trailers Kaveri · KAV-4A6 series
- Drum capacity
- 1 t to 12 t (see variants)
- Maximum drum diameter
- 2.8 m
- Maximum drum width
- 1 m
- Axle
- Tandem
- Jack type
- Mechanical screw
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 nos
Cranes & hydrasBrahmaputraagni3 variants
SampleFor rentCranes & hydras Brahmaputraagni · BRA-E95 series
- Crane capacity
- 40 t to 120 t (see variants)
- Boom length
- 30 m
- Operator
- Included
- Fuel
- Included
- Minimum hire
- 1 shift of 8 h
Lead time 2-3 days · Warranty Replacement within 24 h · MOQ 1 nos
Survey & inspection dronesBrahmaputraagni4 variants
SampleFor rentSurvey & inspection drones Brahmaputraagni · BRA-6A5 series
- Drone class
- RTK mapping to Heavy payload (see variants)
- Sensor
- Radiometric thermal
- Positioning
- PPK
- Flight time
- 90 min
- Pilot
- DGCA licensed remote pilot
Lead time 1 week · Warranty Re-flight at no charge if data unusable · MOQ 1 nos
DG & equipment rentalAravali6 variants
SampleFor rentDG & equipment rental Aravali · ARA-9F7 series
- DG capacity
- 15 kVA to 500 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Client scope
- Enclosure
- CPCB IV+ canopy
- Operator
- Not included
Lead time 2-3 days · Warranty Replacement within 48 h · MOQ 1 nos