Thermal power plant equipment

Steam-cycle equipment and balance of plant for coal, lignite and biomass-fired stations.

Companies offering this · 15

Listings (241)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Surface condenser, Ultra series

SampleSteam turbines & condensers

Ravi · RAV-B69 series

Output
1 MW to 60 MW (see variants)
Turbine type
Condensing
Inlet steam
67 ata / 485 C
Speed
5500 rpm with gearbox
Exhaust pressure
8 ata

Lead time 14-20 months · Warranty 18 months · MOQ 5 nos

Price for verified buyers

by Ravi Thermal Systems (Sample) · invoiced by BARREL

Request quote

LP heater, Flex series

SampleFeed-water pumps & heaters

Pataliputraneel · PAT-631 series

Flow capacity
20 m3/h to 800 m3/h (see variants)
Equipment
Deaerator
Discharge pressure
110 bar
Stages
8
Casing
Segmental ring-section

Lead time 20-30 weeks · Warranty 12 months · MOQ 1 nos

Price for verified buyers

by Pataliputraneel Boilers (Sample) · invoiced by BARREL

Request quote

Stacker-reclaimer, Prime series

SampleCoal & ash handling plant

Magadhsetu · MAG-782 series

Handling capacity
300 TPH to 1200 TPH (see variants)
Equipment
Tippler
Belt width
1400 mm
Belt speed
2.5 m/s
Belt grade
Fabric EP

Lead time 12-18 months · Warranty 18 months · MOQ 5 lot

Price for verified buyers

by Magadhsetu Boilers (Sample) · invoiced by BARREL

Request quote

LP heater, Eco series

SampleFeed-water pumps & heaters

Pataliputraneel · PAT-637 series

Flow capacity
50 m3/h to 1200 m3/h (see variants)
Equipment
HP heater
Discharge pressure
320 bar
Stages
12
Casing
Barrel type

Lead time 10-14 weeks · Warranty 18 months · MOQ 10 nos

Price on quote

by Pataliputraneel Boilers (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited