SCADA, RTU & plant controllersHampi5 variants
SampleSCADA, RTU & plant controllers Hampi · HAM-3C7 series
- I/O capacity
- 32 DI / 16 DO / 8 AI to 512 I/O modular (see variants)
- Protocols
- Modbus RTU/TCP
- CPU
- ARM Cortex-A9
- Power supply
- 48 VDC
- Operating temperature
- -10 to 60 °C
Lead time 8-10 weeks · Warranty 24 months from commissioning · MOQ 1 nos
PCBs & electronic assembliesOhmmax4 variants
SamplePCBs & electronic assemblies Ohmmax · OHM-2D4 series
- Layers / type
- Double-sided to 8-layer (see variants)
- Base material
- Aluminium core
- Copper weight
- 1 oz
- Board thickness
- 1.0 mm
- Surface finish
- ENIG
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Active harmonic filtersTeesta6 variants
SampleActive harmonic filters Teesta · TEE-FF5 series
- Compensation current
- 50 A to 300 A (see variants)
- Voltage
- 3-ph 415 V
- Wires
- 4-wire
- Harmonic order
- 2nd to 50th
- Response time
- < 20 ms
Lead time 3-4 weeks · Warranty 24 months from commissioning · MOQ 10 nos
Energy meters (smart, ABT, net)Hampi5 variants
SampleEnergy meters (smart, ABT, net) Hampi · HAM-256 series
- Meter type
- 1-ph smart 5-30 A to ABT 0.2S 3P4W (see variants)
- Accuracy class
- 1.0
- Reference voltage
- 3x240/415 V
- Frequency
- 50 Hz
- Communication
- RF mesh
Lead time 4-6 weeks · Warranty 5 years from supply · MOQ 2 nos
Field instruments (pressure, temperature, flow, level)Teesta4 variants
SampleField instruments (pressure, temperature, flow, level) Teesta · TEE-0A8 series
- Range / size
- 0-10 bar / DN25 to 0-250 bar / DN100 (see variants)
- Output
- Profibus PA
- Accuracy
- ±0.1%
- Process connection
- 1/2 NPT(F)
- Wetted material
- Tantalum
Lead time 2-4 weeks · Warranty 12 months from commissioning · MOQ 5 nos
Detuned & series reactorsSahyadriagni3 variants
SampleDetuned & series reactors Sahyadriagni · SAH-7D3 series
- Rating
- 25 kVAr to 100 kVAr (see variants)
- Detuning factor
- 14% (134 Hz)
- Rated voltage
- 415 V
- Core
- Air core
- Winding
- Copper
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Digital twins & analyticsCoorgjyoti6 variants
SampleDigital twins & analytics Coorgjyoti · COO-9A7 series
- Plant size
- Up to 10 MW to Portfolio > 1 GW (see variants)
- Deployment
- Hybrid edge
- Data ingestion
- SCADA, historian, IoT
- Models
- Physics-based + machine learning
- Analytics
- Loss attribution, anomaly detection
Lead time 8-12 weeks · Warranty Support as per agreement · MOQ 1 licence
Design & simulation softwareSatavahana6 variants
SampleDesign & simulation software Satavahana · SAT-B46 series
- Edition
- Student / single user 1 year to Site licence (see variants)
- Licence model
- Perpetual with AMC
- Deployment
- Desktop (Windows)
- Simulation engines
- Load flow, short circuit, harmonic
- Weather data
- Site-specific import
Lead time Same day licence key · Warranty Support as per AMC · MOQ 1 licence
Gas & water analysersTrishultron4 variants
SampleGas & water analysers Trishultron · TRI-BC3 series
- Parameter
- Dissolved oxygen to Flue gas O2 (see variants)
- Measurement range
- 0-2000 µS/cm
- Accuracy
- ±1% of reading
- Output
- Relay alarm
- Sample flow
- 100-500 mL/min
Lead time 3-5 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Harmonic filtersSahyadriojas3 variants
Sahyadriojas · SAH-097 series
- Filter rating
- 100 kVAr to 300 kVAr (see variants)
- Tuned to
- 7th
- Voltage
- 11 kV
- Reactor core
- Air core (HV)
- Reactor insulation
- Class H
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Harmonic filtersBundel5 variants
Bundel · BUN-6A5 series
- Filter rating
- 25 kVAr to 300 kVAr (see variants)
- Tuned to
- 4.7th (235 Hz)
- Voltage
- 440 V
- Reactor core
- CRGO laminated
- Reactor insulation
- Class H
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 nos
PCBs & electronic assembliesIndraprasthafaraday4 variants
SamplePCBs & electronic assemblies Indraprasthafaraday · IND-A71 series
- Layers / type
- 6-layer to Heavy copper 4-layer (see variants)
- Base material
- FR-4 Tg 150
- Copper weight
- 6 oz
- Board thickness
- 2.0 mm
- Surface finish
- ENIG
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
SCADA, RTU & plant controllersChambal6 variants
SampleSCADA, RTU & plant controllers Chambal · CHA-E24 series
- I/O capacity
- 16 DI / 8 DO to 512 I/O modular (see variants)
- Protocols
- IEC 61850 server
- CPU
- ARM Cortex-A9
- Power supply
- 48 VDC
- Operating temperature
- -25 to 70 °C
Lead time 4-6 weeks · Warranty 36 months from supply · MOQ 2 nos
STATCOM & SVGMahanadi6 variants
Mahanadi · MAH-242 series
- Rating
- 200 kVAr to 25 MVAr (see variants)
- Voltage
- 690 V
- Topology
- 3-level IGBT
- Response time
- < 5 ms
- Compensation
- Capacitive and inductive, bidirectional
Lead time 8-12 weeks · Warranty 24 months from commissioning · MOQ 10 nos
Radio, RF mesh & LoRaWANNarmada5 variants
SampleRadio, RF mesh & LoRaWAN Narmada · NAR-CF9 series
- Type
- Repeater to PMP base station (see variants)
- Frequency
- 865-867 MHz (India licence-free)
- Output power
- 30 dBm
- Range
- 3 km line of sight
- Data rate
- 50 kbps
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos
Asset & O&M managementTaxilatamra6 variants
SampleAsset & O&M management Taxilatamra · TAX-E29 series
- Capacity covered
- Up to 5 MWp to Portfolio unlimited (see variants)
- Deployment
- Cloud SaaS
- Users
- Unlimited
- Work orders
- Preventive, corrective, predictive
- Mobile app
- Android and iOS offline
Lead time 4-6 weeks · Warranty Support included for subscription term · MOQ 10 licence
Asset & O&M managementVijaya3 variants
SampleAsset & O&M management Vijaya · VIJ-0E4 series
- Capacity covered
- Up to 25 MWp to Up to 250 MWp (see variants)
- Deployment
- On-premise
- Users
- 10
- Work orders
- Preventive, corrective, predictive
- Mobile app
- Android and iOS offline
Lead time 1-2 weeks · Warranty Support included for subscription term · MOQ 1 licence
Satellite & VSATOjasmark5 variants
Ojasmark · OJA-766 series
- Antenna size
- 0.75 m to 3.7 m (see variants)
- Frequency band
- C-band
- BUC power
- 2 W
- Modem rate
- Up to 4 Mbps
- Antenna material
- Aluminium
Lead time 3-5 weeks · Warranty 12 months from supply · MOQ 5 set
Generation forecastingMarwarswarna3 variants
SampleGeneration forecasting Marwarswarna · MAR-472 series
- Plant capacity
- Up to 100 MW to Up to 500 MW (see variants)
- Forecast horizon
- Day-ahead
- Resolution
- 15-minute blocks
- Update frequency
- Every 15 minutes
- Method
- NWP + machine learning
Lead time 1-2 weeks · Warranty Service level as per agreement · MOQ 1 month
Data loggersPennar5 variants
Pennar · PEN-BB9 series
- Channels
- 4 channels to 64 channels (see variants)
- Input types
- 4-20 mA
- Resolution
- 16-bit
- Sampling rate
- 100 ms min
- Memory
- 2 GB
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Digital twins & analyticsSatavahana3 variants
SampleDigital twins & analytics Satavahana · SAT-0D4 series
- Plant size
- Up to 250 MW to Portfolio > 1 GW (see variants)
- Deployment
- Hybrid edge
- Data ingestion
- SCADA, historian, IoT
- Models
- Physics-based + machine learning
- Analytics
- Loss attribution, anomaly detection
Lead time 3-4 weeks · Warranty Subscription support · MOQ 2 licence
Distribution transformer monitoring units (DTMU)Chambal5 variants
SampleDistribution transformer monitoring units (DTMU) Chambal · CHA-E76 series
- DT rating covered
- Up to 63 kVA to 1250-2000 kVA (see variants)
- Measurement
- V, I, kW, kVA, PF, THD
- Accuracy class
- 0.5S
- CT input
- CT 1000/1 A
- Communication
- RF mesh
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 10 nos
SDH / MPLS & fibre terminal equipmentKutchvayu4 variants
SampleSDH / MPLS & fibre terminal equipment Kutchvayu · KUT-B19 series
- Capacity
- STM-16 to 100G DWDM (see variants)
- Interface
- 1G Ethernet
- Optical reach
- 40 km
- Protection
- 1+1 MSP
- Wavelength
- 1550 nm
Lead time 8-10 weeks · Warranty 36 months from supply · MOQ 1 nos
OT cybersecurity (IEC 62443)Vijaya5 variants
SampleOT cybersecurity (IEC 62443) Vijaya · VIJ-533 series
- Assets monitored
- Up to 50 assets to Up to 20,000 assets (see variants)
- Deployment
- Passive sensor + central
- Protocol DPI
- OPC UA
- Functions
- Asset inventory, anomaly detection, CVE mapping
- Alerting
- SIEM syslog
Lead time 4-6 weeks · Warranty 12 months support · MOQ 1 licence