Pre-engineered buildings (PEB)Vajraline5 variants
SamplePre-engineered buildings (PEB) Vajraline · VAJ-B64 series
- Clear span
- 15 m to 36 m (see variants)
- Primary frame
- Built-up tapered I-section
- Steel grade
- IS 2062 E250
- Roof sheeting
- 0.5 mm Galvalume
- Wall cladding
- Brick below 3 m
Lead time 6-8 weeks · Warranty 10 years structural · MOQ 1 sq m
HVAC & ventilationArcmark4 variants
Arcmark · ARC-6D1 series
- Capacity
- 2 TR to 8 TR (see variants)
- Type
- Ducted
- Refrigerant
- R32
- Power supply
- 230 V single phase
- Compressor
- Inverter rotary
Lead time 1-2 weeks · Warranty 5 years compressor · MOQ 10 nos
CEMS & ambient air monitoringMahanadi6 variants
SampleCEMS & ambient air monitoring Mahanadi · MAH-908 series
- Parameters monitored
- PM only to Full CEMS 8 parameters (see variants)
- Measurement method
- In-situ
- Particulate sensor
- Opacity
- Gas analyser
- UV fluorescence
- Data logging
- Modbus TCP
Lead time 10-14 weeks · Warranty 24 months on analysers · MOQ 2 set
Effluent & sewage treatment (ETP / STP)Arcmax3 variants
SampleEffluent & sewage treatment (ETP / STP) Arcmax · ARC-779 series
- Capacity
- 100 KLD to 500 KLD (see variants)
- Process
- SBR
- Tank material
- FRP
- Treated BOD
- Below 20 mg/l
- Blower
- Twin lobe
Lead time 8-12 weeks · Warranty 24 months on equipment · MOQ 1 set
Air compressors & dryersWayanad3 variants
SampleAir compressors & dryers Wayanad · WAY-943 series
- Motor rating
- 15 kW to 37 kW (see variants)
- Working pressure
- 13 bar
- Free air delivery
- 1.2 cu m/min
- Type
- Reciprocating
- Drive
- VFD
Lead time 2-3 weeks · Warranty 24 months airend · MOQ 2 nos
SCR / SNCR NOx controlMahanadi6 variants
SampleSCR / SNCR NOx control Mahanadi · MAH-739 series
- Flue gas flow
- 20000 Nm3/h to 1000000 Nm3/h (see variants)
- Technology
- Hybrid
- NOx removal efficiency
- 85%
- Reagent
- Aqueous ammonia
- Catalyst
- Honeycomb V2O5-WO3/TiO2
Lead time 30-44 weeks · Warranty 24000 operating hours on catalyst · MOQ 1 set
ESP & bag filtersSaurashtra3 variants
Saurashtra · SAU-458 series
- Gas flow rate
- 25000 Am3/h to 100000 Am3/h (see variants)
- Outlet emission
- Below 30 mg/Nm3
- Inlet temperature
- Up to 180 deg C
- Filter media
- PTFE membrane
- Cleaning
- Reverse air
Lead time 12-16 weeks · Warranty 12 months from commissioning · MOQ 5 set
Conveyors & material handlingWayanad4 variants
SampleConveyors & material handling Wayanad · WAY-765 series
- Belt width
- 650 mm to 1200 mm (see variants)
- Belt type
- EP 200 rubber
- Capacity
- 250 TPH
- Belt speed
- 1.6 m/s
- Idler pitch
- 1.2 m
Lead time 10-14 weeks · Warranty 18 months from supply · MOQ 2 m
Impressed-current & sacrificial-anode CPNanditek3 variants
SampleImpressed-current & sacrificial-anode CP Nanditek · NAN-5F6 series
- TR unit rating
- 50 V 25 A to 50 V 100 A (see variants)
- System type
- ICCP
- Anode material
- Magnesium 17 lb
- Cooling
- Oil cooled
- Output
- Constant current
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 set
HVAC & ventilationShivalikprakash5 variants
Shivalikprakash · SHI-4A2 series
- Capacity
- 2 TR to 10 TR (see variants)
- Type
- Precision
- Refrigerant
- R32
- Power supply
- 415 V 3 phase
- Compressor
- Inverter rotary
Lead time 1-2 weeks · Warranty 12 months comprehensive · MOQ 10 nos
Noise controlSaurashtra6 variants
Saurashtra · SAU-CA5 series
- Insertion loss
- 15 dB to 40 dB (see variants)
- Equipment served
- Fan
- Panel construction
- GI perforated with rockwool
- Infill
- Rockwool 100 mm
- Sheet thickness
- 2.0 mm
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 2 nos
Noise controlMahanadi6 variants
Mahanadi · MAH-345 series
- Insertion loss
- 15 dB to 40 dB (see variants)
- Equipment served
- Transformer
- Panel construction
- GI perforated with rockwool
- Infill
- Rockwool 100 mm
- Sheet thickness
- 1.6 mm
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 10 nos
Flue-gas desulphurisation (FGD)Amaravatitej4 variants
SampleFlue-gas desulphurisation (FGD) Amaravatitej · AMA-056 series
- Boiler size
- 60 MW to 350 MW (see variants)
- Technology
- Dry sorbent
- SO2 removal efficiency
- 80%
- Inlet SO2
- Up to 2500 mg/Nm3
- Absorber material
- Alloy lined
Lead time 40-60 weeks · Warranty 12 months from commissioning · MOQ 5 set
Effluent & sewage treatment (ETP / STP)Nilgiri4 variants
SampleEffluent & sewage treatment (ETP / STP) Nilgiri · NIL-2B3 series
- Capacity
- 100 KLD to 1000 KLD (see variants)
- Process
- Extended aeration
- Tank material
- MS epoxy coated
- Treated BOD
- Below 20 mg/l
- Blower
- Twin lobe
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 set
Ash utilisationMunnarspark5 variants
Munnarspark · MUN-288 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 400 sq m/kg (see variants)
- Source
- ESP hopper
- Grade
- Siliceous Grade 2
- Loss on ignition
- Below 2%
- Moisture
- Below 5%
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 2 MT
Effluent & sewage treatment (ETP / STP)Dwarakahertz3 variants
SampleEffluent & sewage treatment (ETP / STP) Dwarakahertz · DWA-546 series
- Capacity
- 250 KLD to 1000 KLD (see variants)
- Process
- SBR
- Tank material
- FRP
- Treated BOD
- Below 20 mg/l
- Blower
- Ring blower
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 set
Transformer plinths, oil pits & soak pitsTaxila3 variants
SampleServiceTransformer plinths, oil pits & soak pits Taxila · TAX-4A9 series
- Transformer rating served
- 1 MVA to 10 MVA (see variants)
- Concrete grade
- M25
- Oil pit capacity
- 110% of oil volume
- Pit fill
- Gravel 400 mm
- Pit waterproofing
- Epoxy coating
Lead time 2-3 weeks · Warranty 12 months defect liability · MOQ 1 nos
HVAC & ventilationVaigaiagni6 variants
Vaigaiagni · VAI-8F1 series
- Capacity
- 1.5 TR to 10 TR (see variants)
- Type
- Ducted
- Refrigerant
- R32
- Power supply
- 415 V 3 phase
- Compressor
- Scroll
Lead time 3-4 weeks · Warranty 5 years compressor · MOQ 1 nos
Precast cable trenches & RCC productsMewararc3 variants
SamplePrecast cable trenches & RCC products Mewararc · MEW-6F6 series
- Trench inner size (W x D)
- 800 x 800 mm to 1200 x 1200 mm (see variants)
- Unit length
- 1 m
- Concrete grade
- M30
- Wall thickness
- 75 mm
- Cover slab
- GRP
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 10 m
Ash utilisationDeccanvolt5 variants
Deccanvolt · DEC-468 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 400 sq m/kg (see variants)
- Source
- Pond ash
- Grade
- Siliceous Grade 2
- Loss on ignition
- Below 2%
- Moisture
- Below 5%
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 5 MT
Roads, drains & culvertsNarmadashakti6 variants
SampleServiceRoads, drains & culverts Narmadashakti · NAR-997 series
- Road width
- 3.5 m to 10 m (see variants)
- Pavement type
- WBM + bituminous
- Sub-base
- GSB 150 mm
- Base course
- WMM 250 mm
- Drain type
- Brick masonry drain
Lead time 4-6 weeks · Warranty 12 months defect liability · MOQ 1 m
CEMS & ambient air monitoringParamline4 variants
SampleCEMS & ambient air monitoring Paramline · PAR-6D3 series
- Parameters monitored
- PM only to PM + SO2 + NOx + O2 (see variants)
- Measurement method
- Extractive hot-wet
- Particulate sensor
- Opacity
- Gas analyser
- NDIR
- Data logging
- Modbus TCP
Lead time 10-14 weeks · Warranty 12 months from commissioning · MOQ 10 set
Impressed-current & sacrificial-anode CPKakatiyatej6 variants
SampleImpressed-current & sacrificial-anode CP Kakatiyatej · KAK-845 series
- TR unit rating
- 12 V 10 A to 100 V 100 A (see variants)
- System type
- ICCP
- Anode material
- Magnesium 17 lb
- Cooling
- Oil cooled
- Output
- Constant current
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 10 set
RO & DM plantsKrishnashikhar3 variants
Krishnashikhar · KRI-755 series
- Permeate capacity
- 5 cu m/h to 25 cu m/h (see variants)
- Recovery
- 85%
- Membrane
- 8 inch TFC
- Feed TDS
- Up to 2000 ppm
- Permeate conductivity
- Below 0.2 microS/cm DM
Lead time 4-6 weeks · Warranty 6 months on membranes · MOQ 2 set