Protective coatings & wrapsNarmada5 variants
SampleProtective coatings & wraps Narmada · NAR-496 series
- Pack size
- 1 litre to 50 litre (see variants)
- Coating type
- Epoxy
- Number of packs
- Two pack
- Dry film thickness
- 150 micron
- Solid by volume
- 70%
Lead time 1-2 weeks · Warranty 10 years coating life as per system · MOQ 5 litre
Trench coversChambalgrid3 variants
Chambalgrid · CHA-CF5 series
- Cover size (L x W)
- 900 x 600 mm to 1200 x 900 mm (see variants)
- Material
- SMC composite
- Thickness
- 75 mm
- Load class
- Heavy vehicle 20 t
- Weight
- 25 kg
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 10 nos
Fencing & gatesChambalgrid3 variants
Chambalgrid · CHA-182 series
- Fence height
- 1.8 m to 2.4 m (see variants)
- Mesh type
- 358 anti-climb
- Wire diameter
- 4.0 mm
- Post
- Angle 50x50x6
- Post spacing
- 3 m
Lead time 3-4 weeks · Warranty 5 years against rusting · MOQ 1 m
Protective coatings & wrapsNarmada3 variants
SampleProtective coatings & wraps Narmada · NAR-A45 series
- Pack size
- 10 litre to 50 litre (see variants)
- Coating type
- Epoxy
- Number of packs
- Two pack
- Dry film thickness
- 150 micron
- Solid by volume
- 80%
Lead time 3-7 days · Warranty 10 years coating life as per system · MOQ 1 litre
Cooling-water & boiler chemicalsSatavahanaflux3 variants
SampleCooling-water & boiler chemicals Satavahanaflux · SAT-549 series
- Pack size
- 200 kg to 1000 kg (see variants)
- Chemical type
- Scale inhibitor
- Form
- Powder
- Active content
- 30%
- pH of product
- 9-11
Lead time 3-7 days · Warranty 24 months in sealed pack · MOQ 10 kg
Piles & foundationsEllorashikhar6 variants
SamplePiles & foundations Ellorashikhar · ELL-006 series
- Pile diameter
- 450 mm to 1200 mm (see variants)
- Pile type
- Screw steel
- Concrete grade
- M25
- Pile length
- 18 m
- Reinforcement
- Fe 550D
Lead time 4-6 weeks · Warranty 12 months against workmanship · MOQ 1 nos
ESP & bag filtersAwadhshikhar5 variants
Awadhshikhar · AWA-F01 series
- Gas flow rate
- 10000 Am3/h to 250000 Am3/h (see variants)
- Outlet emission
- Below 50 mg/Nm3
- Inlet temperature
- Up to 250 deg C
- Filter media
- PTFE membrane
- Cleaning
- Reverse air
Lead time 12-16 weeks · Warranty 12 months from commissioning · MOQ 5 set
Pre-engineered buildings (PEB)Hertzgen3 variants
SamplePre-engineered buildings (PEB) Hertzgen · HER-F81 series
- Clear span
- 18 m to 30 m (see variants)
- Primary frame
- Built-up tapered I-section
- Steel grade
- IS 2062 E250
- Roof sheeting
- Insulated PUF panel
- Wall cladding
- 0.45 mm PPGI
Lead time 6-8 weeks · Warranty 10 years structural · MOQ 10 sq m
Water testing laboratoriesArcmax6 variants
SampleServiceWater testing laboratories Arcmax · ARC-458 series
- Parameter panel
- Basic 10 parameters to Complete 60+ parameters (see variants)
- Sample type
- Cooling water
- Reporting
- Digital report
- Accreditation
- NABL accredited
- Turnaround
- 10 days
Lead time 3-5 days · Warranty Free re-test on lab error · MOQ 1 job
Impressed-current & sacrificial-anode CPRajattek6 variants
SampleImpressed-current & sacrificial-anode CP Rajattek · RAJ-5F8 series
- TR unit rating
- 12 V 10 A to 100 V 100 A (see variants)
- System type
- Galvanic
- Anode material
- Magnesium 17 lb
- Cooling
- Air cooled
- Output
- Constant current
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 5 set
Cooling-water & boiler chemicalsAwadhtej3 variants
SampleCooling-water & boiler chemicals Awadhtej · AWA-541 series
- Pack size
- 25 kg to 200 kg (see variants)
- Chemical type
- Scale inhibitor
- Form
- Liquid
- Active content
- 50%
- pH of product
- 9-11
Lead time 3-7 days · Warranty 24 months in sealed pack · MOQ 2 kg
Water testing laboratoriesAwadhtej3 variants
SampleServiceWater testing laboratories Awadhtej · AWA-454 series
- Parameter panel
- Physical and chemical 25 to Heavy metals panel (see variants)
- Sample type
- Water
- Reporting
- Hard copy with seal
- Accreditation
- NABL accredited
- Turnaround
- 7 days
Lead time 7-10 days · Warranty Report valid for the sampled lot · MOQ 1 job
EOT & gantry cranes, hoistsWayanad3 variants
SampleEOT & gantry cranes, hoists Wayanad · WAY-E83 series
- Capacity
- 3 t to 10 t (see variants)
- Span
- 25 m
- Duty class
- M3
- Hoisting speed
- 5/0.8 m/min
- Lift height
- 9 m
Lead time 10-12 weeks · Warranty 12 months from commissioning · MOQ 1 nos
HVAC & ventilationAmrittek3 variants
Amrittek · AMR-6D3 series
- Capacity
- 1.5 TR to 3 TR (see variants)
- Type
- Precision
- Refrigerant
- R410A
- Power supply
- 230 V single phase
- Compressor
- Inverter rotary
Lead time 1-2 weeks · Warranty 12 months comprehensive · MOQ 1 nos
Ash utilisationAmaravatitej3 variants
Amaravatitej · AMA-567 series
- Fly ash fineness (Blaine)
- 250 sq m/kg to 320 sq m/kg (see variants)
- Source
- Pond ash
- Grade
- Siliceous Grade 1
- Loss on ignition
- Below 2%
- Moisture
- Below 1%
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 1 MT
Water testing laboratoriesNilgiri4 variants
SampleServiceWater testing laboratories Nilgiri · NIL-434 series
- Parameter panel
- Basic 10 parameters to Heavy metals panel (see variants)
- Sample type
- Wastewater
- Reporting
- Digital report
- Accreditation
- NABL accredited
- Turnaround
- 10 days
Lead time 3-5 days · Warranty Report valid for the sampled lot · MOQ 1 job
Effluent & sewage treatment (ETP / STP)Dwarakaprakash6 variants
SampleEffluent & sewage treatment (ETP / STP) Dwarakaprakash · DWA-779 series
- Capacity
- 10 KLD to 500 KLD (see variants)
- Process
- MBR
- Tank material
- FRP
- Treated BOD
- Below 20 mg/l
- Blower
- Twin lobe
Lead time 4-6 weeks · Warranty 24 months on equipment · MOQ 1 set
Impressed-current & sacrificial-anode CPPushpaktron6 variants
SampleImpressed-current & sacrificial-anode CP Pushpaktron · PUS-615 series
- TR unit rating
- 12 V 10 A to 100 V 100 A (see variants)
- System type
- Galvanic
- Anode material
- MMO titanium
- Cooling
- Oil cooled
- Output
- Constant current
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 5 set
CEMS & ambient air monitoringDeccanvolt4 variants
SampleCEMS & ambient air monitoring Deccanvolt · DEC-106 series
- Parameters monitored
- PM + SO2 to PM + gases + flow (see variants)
- Measurement method
- In-situ
- Particulate sensor
- Opacity
- Gas analyser
- NDIR
- Data logging
- Modbus TCP
Lead time 10-14 weeks · Warranty 24 months on analysers · MOQ 2 set
ESP & bag filtersKamrup3 variants
Kamrup · KAM-F04 series
- Gas flow rate
- 250000 Am3/h to 1000000 Am3/h (see variants)
- Outlet emission
- Below 50 mg/Nm3
- Inlet temperature
- Up to 180 deg C
- Filter media
- Polyester
- Cleaning
- Pulse jet
Lead time 20-28 weeks · Warranty 24 months on mechanical parts · MOQ 5 set
Corrosion monitoringWattsys3 variants
SampleCorrosion monitoring Wattsys · WAT-009 series
- Channel count
- 2 channel to 8 channel (see variants)
- Measurement
- Linear polarisation resistance
- Range
- 0-20 mm/year
- Accuracy
- +/-1 mV
- Logging interval
- 1 h
Lead time 2-3 weeks · Warranty 24 months with calibration · MOQ 1 set
Geotextiles & slope protectionVajraline3 variants
SampleGeotextiles & slope protection Vajraline · VAJ-A64 series
- Mass per unit area
- 300 gsm to 600 gsm (see variants)
- Material
- HDPE
- Construction
- Woven
- Roll width
- 5 m
- Roll length
- 100 m
Lead time 1-2 weeks · Warranty 10 years UV life (limited) · MOQ 1 sq m
Impressed-current & sacrificial-anode CPDeccanpushpak5 variants
SampleImpressed-current & sacrificial-anode CP Deccanpushpak · DEC-C31 series
- TR unit rating
- 12 V 10 A to 50 V 100 A (see variants)
- System type
- ICCP
- Anode material
- HSCI
- Cooling
- Air cooled
- Output
- Constant potential
Lead time 3-4 weeks · Warranty Anode life as per design (20 years) · MOQ 2 set
Water storage & pumpingBetwafaraday4 variants
SampleWater storage & pumping Betwafaraday · BET-892 series
- Motor rating
- 3.7 kW to 22 kW (see variants)
- Pump type
- Submersible
- Head
- 20 m
- Flow
- 100 cu m/h
- Casing material
- Cast iron
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 nos