Carbon credits & offsetsAravali5 variants
SampleServiceCarbon credits & offsets Aravali · ARA-235 series
- Annual credits
- 5,000 tCO2e to 500,000 tCO2e (see variants)
- Programme
- Both
- Project type
- Renewable energy
- Methodology
- Approved methodology selection
- MRV
- Annual report
Lead time Feasibility in 2-3 weeks · Warranty Fee linked to issuance · MOQ 1 job
SCADA / EMS / DMS platformsPallava4 variants
SampleSCADA / EMS / DMS platforms Pallava · PAL-F54 series
- Points / tags
- 500 tags to 50,000 tags (see variants)
- Architecture
- Client-server
- Protocols
- IEC 60870-5-104
- Database
- SQL
- Redundancy
- Hot standby
Lead time 12-20 weeks · Warranty 12 months support · MOQ 2 licence
OT cybersecurity (IEC 62443)Lumenmark5 variants
SampleOT cybersecurity (IEC 62443) Lumenmark · LUM-B33 series
- Assets monitored
- Up to 50 assets to Up to 20,000 assets (see variants)
- Deployment
- Virtual appliance
- Protocol DPI
- IEC 61850
- Functions
- Asset inventory, anomaly detection, CVE mapping
- Alerting
- SIEM syslog
Lead time 10-14 weeks · Warranty 12 months support · MOQ 1 licence
Warehousing & yard managementMunnar6 variants
SampleServiceWarehousing & yard management Munnar · MUN-B97 series
- Storage area
- 500 sq m to 25000 sq m (see variants)
- Storage type
- Covered warehouse
- Handling equipment
- Heavy cranes up to 100 tonnes
- Security
- 24x7 guards and CCTV
- Inventory system
- WMS with barcode
Lead time Space available in 3-7 days · Warranty Insurance cover · MOQ 1 month
SDH / MPLS & fibre terminal equipmentKalinga5 variants
SampleSDH / MPLS & fibre terminal equipment Kalinga · KAL-B19 series
- Capacity
- STM-4 to 100G DWDM (see variants)
- Interface
- 1G Ethernet
- Optical reach
- 40 km
- Protection
- SNCP
- Wavelength
- CWDM/DWDM
Lead time 12-16 weeks · Warranty 36 months from supply · MOQ 1 nos
EPC / turnkey contractingPrakashtron6 variants
SampleServiceEPC / turnkey contracting Prakashtron · PRA-C24 series
- Project capacity
- 1 MWp to 100 MWp (see variants)
- Scope
- Design, supply, install, commission
- Module technology
- TOPCon DCR
- Inverter
- String inverter
- Performance guarantee
- PR 80% for first year
Lead time 3-6 months to commissioning · Warranty Defect liability 24 months · MOQ 1 MWp
Fuel-gas conditioning & pressure-reducing skidsPataliputra4 variants
SampleFuel-gas conditioning & pressure-reducing skids Pataliputra · PAT-671 series
- Flow capacity
- 1000 Sm3/h to 25000 Sm3/h (see variants)
- Inlet pressure
- 25-100 bar
- Outlet pressure
- 4 bar
- Pressure regulation
- Active-monitor redundant
- Filtration
- Coalescer separator, 5 micron
Lead time 16-22 weeks · Warranty 18 months · MOQ 1 nos
Open-access approvalsRavipushpak6 variants
SampleServiceOpen-access approvals Ravipushpak · RAV-353 series
- Contract demand
- 1 MW to 100 MW (see variants)
- Access type
- Green energy open access
- Scope
- Agreement drafting and execution
- Approvals
- SLDC
- Charges analysis
- Wheeling, CSS and additional surcharge
Lead time Filing in 1 week · Warranty Rework for deficient applications · MOQ 1 application
ODC & heavy-haul transportMalwavolt3 variants
SampleServiceODC & heavy-haul transport Malwavolt · MAL-9E2 series
- Consignment weight
- 20 tonnes to 100 tonnes (see variants)
- Equipment
- Hydraulic multi-axle
- Route survey
- Optional
- Escort and permits
- Police and highway permits included
- Insurance
- Marine-cum-road transit insurance
Lead time Dispatch in 5-10 days · Warranty Transit damage claims support · MOQ 1 job
Biomass handling & storageUjjayiniohm3 variants
SampleBiomass handling & storage Ujjayiniohm · UJJ-4F1 series
- Storage capacity
- 50 m3 to 250 m3 (see variants)
- Equipment
- Walking floor
- Material
- SS 304
- Discharge rate
- 5 TPH
- Motor power
- 7.5 kW
Lead time 4-6 weeks · Warranty 18 months · MOQ 10 nos
Gas-insulated switchgear (GIS)Ujjayini4 variants
SampleGas-insulated switchgear (GIS) Ujjayini · UJJ-0F3 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Rated current
- 2500 A
- Short-circuit current
- 31.5 kA
- Configuration
- Ring bus
- Enclosure
- Aluminium alloy
Lead time 20-28 weeks · Warranty 36 months · MOQ 2 bay
Substation constructionHampiurja3 variants
SampleServiceSubstation construction Hampiurja · HAM-364 series
- Voltage class
- 66 kV to 220 kV (see variants)
- Type
- Outdoor AIS
- Scope
- Civil and structural
- Transformers
- Up to 315 MVA
- Earthing
- Copper-bonded rods
Lead time Execution 6-15 months · Warranty Equipment as per OEM · MOQ 1 bay
Penstocks, gates & hoistsJhelumojas5 variants
SamplePenstocks, gates & hoists Jhelumojas · JHE-D43 series
- Diameter / size
- 1.6 m to 5.0 m (see variants)
- Steel grade
- IS 2062 E250
- Plate thickness
- 12-30 mm
- Design head
- 400 m
- Lining
- Coal tar epoxy
Lead time 14-20 weeks · Warranty 12 months · MOQ 5 MT
Emergency & exit lightingAravali6 variants
SampleEmergency & exit lighting Aravali · ARA-217 series
- Wattage
- 2 W to 18 W (see variants)
- Type
- Combined exit sign
- Backup duration
- 2 hours
- Battery
- Ni-Cd
- Recharge time
- 24 hours
Lead time 1-2 weeks · Warranty 36 months from supply · MOQ 2 nos
Company secretarial & complianceSudarshangen3 variants
SampleServiceCompany secretarial & compliance Sudarshangen · SUD-161 series
- Entity count
- 5 entities to 25 entities (see variants)
- Services
- Incorporation
- Entity type
- LLP
- Filings
- Event-based forms
- Secretarial audit
- Included
Lead time Start in 3 days · Warranty Filing errors corrected at no cost · MOQ 1 month
Traction SCADADhruvline4 variants
Dhruvline · DHR-6A1 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot
Stringing machinesAmaravatirajat3 variants
Amaravatirajat · AMA-067 series
- Maximum tension
- 50 kN to 100 kN (see variants)
- Type
- Tensioner
- Drive
- Diesel hydraulic
- Bullwheel diameter
- 2200 mm
- Conductor size
- Twin Moose
Lead time 16-24 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Cable cleatsDoabasamarth4 variants
Doabasamarth · DOA-254 series
- Cable diameter
- 30-45 mm to 80-100 mm (see variants)
- Arrangement
- Flat
- Material
- Stainless steel 316
- Short-circuit rating
- Up to 100 kA peak
- Fixing
- M10
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 nos
Statutory approvals (CEIG, pollution, forest)Kakatiyaanant5 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Kakatiyaanant · KAK-574 series
- Approval package
- Single NOC to Wind park set (10) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Drawing and application preparation
- Liaison
- Site inspection coordination
- Statutory fee
- At actuals
Lead time Approval 4-24 weeks · Warranty Rework of rejected applications at no fee · MOQ 1 application
Hydrogen sensors & safety systemsKonkanpushpak4 variants
SampleHydrogen sensors & safety systems Konkanpushpak · KON-F91 series
- Detection range
- 0-1000 ppm to 0-100% vol (see variants)
- Sensor type
- Thermal conductivity
- Output
- Relay
- Response time T90
- < 30 s
- Accuracy
- +/- 5% of FS
Lead time 6-8 weeks · Warranty 12 months · MOQ 5 nos
Bus ductsMysoreohm3 variants
Mysoreohm · MYS-3D6 series
- Rating
- 1600 A to 3200 A (see variants)
- Conductor
- Copper
- Rated voltage
- 1000 V
- Construction
- Sandwich type
- Short-circuit withstand
- 50 kA/1 s
Lead time 8-10 weeks · Warranty 12 months from commissioning · MOQ 1 m
Solar DC cablesNanditek6 variants
Nanditek · NAN-7D9 series
- Size
- 4 sq mm to 35 sq mm (see variants)
- Rated voltage
- 1.5/1.5 kV DC
- Conductor
- Tinned copper class 5
- Insulation
- Radiation cross-linked polyolefin
- Sheath
- XLPO halogen-free
Lead time 2-3 weeks · Warranty 25 years performance (limited) · MOQ 1 m
Diesel & gas gensetsVayumax5 variants
SampleDiesel & gas gensets Vayumax · VAY-593 series
- Rating
- 15 kVA to 250 kVA (see variants)
- Fuel
- Natural gas
- Engine speed
- 1500 rpm
- Voltage
- 11 kV
- Phase
- 3-phase 4-wire
Lead time 4-8 weeks · Warranty 36 months · MOQ 5 nos
Wind turbine sparesVaigai4 variants
SampleWind turbine spares Vaigai · VAI-4A5 series
- Turbine class
- 1.5 MW to 3.3 MW (see variants)
- Component
- Filter
- Fits make
- As per turbine nameplate
- Origin
- OEM
- Material
- Steel
Lead time 8-16 weeks · Warranty 18 months from supply · MOQ 1 nos